Bid Documents for PIC-752/Long Street Improvements OPWC Project CT72N/CT73N below
PIC-752/Long Street Improvements OPWC Bid Book | Addendum #2 | Drawings #1 |
Drawings #2 | Traffic Drawings and Information | Appendix A |
OPWC Information | Prevailing Wage |
Contract for PIC-752/Long St. Improvements OPWC Project CT72N/CT73N below
Contract Decker Construction & Village of Ashville | 12-2013 Resolution Village of Ashville | Request to Proceed |
Notice to Proceed from OPWC | Connnect to Decker Construction | |
Pre-Construction Meeting |
The Stormwater Center Alley Project is not directly part of the above project but was added to improve water drainage in the same area. The ($92,000) Center Alley Project has begun. Click on the following icon to read the letter sent to the residents in the area:
The letter encourage residents and businesses in this area to contact Franklin Christman at 740/983-7164 if they are interested in connecting to this stormwater main. This connection could include gutters, sump pumps, and yard drains.
February 10, 2012 Cox Paving has completed from South Street to Hall Street. Columbia Gas will be doing some line work between Hall Street and State Route 752 during the early part of February 13.
On February 20, 2012 Cox Paving is now north of Hall Street moving toward State Route 752.
The Village of Ashville is working with South Central Power, Frontier Communication, and Time Warner to remove all poles that are located at this intersection. Meetings have been very encouraging.
The 2009 drawing below represents the early concept for revising the intersection of State Route 752 and Long (316) Street. An engineering firm is refining this drawing. When it is available it will replace the one below. By clicking on the image you can download a pdf that is more well-defined.