Article Index

 


Construction Process from Bidding to Construction for Part A

Item Link to Document

Schedule

schedule
Legal Notice
 Notice
Pre-Bid Agenda
bid
Bid Sign-in Sheet
Pen
Bid Documents
bid
AECOM Bid Comparison Letter
picture2
Bid Presentation to Village Council
 Bid to council
Bid Submitted by Peterson Construction
Peterson
Resolution Authorizing Contract
Resolution
Insurance Pen
Notice of Award 
award
Construction Agreement
 Construction
Construction Testing Agreement
psi
Pre-Construction pdf of PowerPoint
preconstructionpp
Pre-Construction Meeting Sign-in
 Pen
Pre-Construction Agenda
Construction
Pre-Construction Minutes
 minutes
Pre-Construction Drawings
exhibit f engineering
Notice to Proceed 
Proceed
Notice of Commencement of Public Improvement
 Proceed
Schedule
 schedule
Contact List
 Contact
Emergency Contact List Contact

 


Public Notice Concerning Water Resource Recovery Facility Project's Environmental Assessment (EA) and finding of no significant impact (FONSI) 

Environmental Assessment (EA)The Ohio EPA will make available for public review an Environmental Assessment of the Water Resource Recovery Project Preliminary EA and finding of no significant impact (FONSI). The public will have a 30-day period in which to review the environmental assessment and provide comments back to Ohio EPA to the staff environmental planner listed at the back of the document. The project consists ofconstruction of a new wastewater facility located south of State Route 752. Upon its release, the document may be viewed at either: the village’s website at www.ashvilleohio.gov/index.php/public-notices, Ohio EPA’s website at(http://epa.ohio.gov/defa/public_comment.aspx), or in hard copy at the village administrative building or the local public library. If you would like to receive either an electronic copy via e-mail or a paper copy of the document via U.S. mail upon its release, please contact Rose McLean of Ohio EPA at either:This email address is being protected from spambots. You need JavaScript enabled to view it. or (614) 644-3664. To access a pdf of the report click on the following image:

mh900439818                           mh900439818 
 Preliminary EA and finding of no significant impact (FONSI)    Final EA and finding of no significant impact (FONSI)

 


Property Acquisition

Property Purchased and Annexation  
Resolution to Purchase    March 14, 2014
North Property Documents  
South Property Documents    
Annexation Material   
Annexation Acceptance Ordinance 2015-09  
Annexation Resolution 05-2015    Petition Ordinance 2015-06     
Amending Petition Ordinance 2015-08     709.16 Petition to Pickaway County   
Annexation Plat    General Annextion Information   

 

Announcement

The location for construction of a Facility was announced at the December 2, 2013 Village Council Meeting. Access to the meeting presentation can be obtained by clicking on the image to the right.

 

presentation for property acquistion
Property Reports    
Resolution to Purchase    
Phase I Environmental Site Assessment Phase I Appendix A, B, & C Preliminary Subsurface Exploration Report

 

AECOM Public Presentation September 28, 2015  
PowerPoint in pdf format

Ohio EPA Director's Final Finding and Orders Quarterly Report

Cover of Report Water Resource Recovery Facility (WRRF) Inflow & Infratration (I & I) Special Environmetal Project (SEP)
4th Quarter - 2014 waste water logo i  i logo sep logo
1st Quarter 2015 waste water logo i  i logo  sep logo
2nd Quarter 2015 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement. 
3rd Quarter 2015 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement.
4th Quarter 2015 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement.
1st Quarter 2016 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement.
2nd Quarter 2016 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement.
3rd Quarter 2016 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement.
4th Quarter 2016 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement.
1st Quarter 2017 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement.
2nd Quarter 2017 waste water logo i  i logo The SEP Report above represents the completion of the SEP requirement.

The pdf below will include I & I and SEP. Resolution 07-2014 Authorization OhioEPA Director's Final "Findings & Orders" (DFFO)

Resolution and "Findings and Orders document"  


Ohio Water Development Authority (OWDA), Division of Environmental & Financial Assistance (DEFA), Ohio Water Pollution Control Loan Fund (WPCLF) and (Ohio Public Works Commission) OPWC Loan Information

 

OWDA Loan Application for Part B   OWDA 

2016 Division of Environmental & Financial Assistance (DEFA) click on OhioEPA Logo to go there ohio epa logo
OhioEPA Agreement Signed
Letter from OhioEPA with Loan Approval Notice  
Letter to OhioEPA  
Water Pollution Control Loan Agreement Village & Solicitor signatures  
Signed Exhibit 1  
Legal Letter from Ashville's Solicitor on the Agreement  
General Certificate  
General Certificate Legislative Support and Minutes Support   
General Certficate Rate Legislation, Minutes, and Newsletter Support  
Water Pollution Control Loan Fund (WPCLF) Sewered Construction Application December 8, 2016 page 1-10  
Authorization Ordinance  .  
Authorization Resolution 04-2015  .
Rate Structure Legislation and Documentation  .
AECOM/URS Contract  .
AECOM/URS Contract Continued  .
2013/14 Village of Ashville Audit .
2011/12 Village of Ashville Audit  .
2009/10 Village of Ashville Audit  .
2007/08 Village of Ashville Audit .

 

Ohio Public Works Commission (OPWC) Application Round 30 Loan/Grant General Exhibits
Application Received  
Loan/Grant Application for Part B   Part B Engineer's Opinion on Cost   Part B Fiscal Officer Revised 7   
Ohio WPCLF Nomination Form 2016   Part B Affordability Calculation    
Loan/Grant Application Loan/Grant Narrative  
Loan Assistance Credit Enhancement Application Credit Enhancement Narrative  
Application Exhibit 1 Narrative Attachment Census 1  Low & Moderate Income (LMI)
Application Exhibit 2 Narrative Attachment CIR5Y 2Narrative Attachment CIR5Y 2 FEMA - RIRM Pickaway County/Ashville
Application Exhibit 3 Narrative Attachment Findings & Orders 3 Letter to District 17 Susan Spiker
  Narrative Attachment URS/AECOM 4 Village of Ashville Resolution 13-2015
Cover - The Table of Content Narrative Attachment Rates 5  
Letter to District 17 Susan Spiker Narrative Attachment Facility Plan 6  
Letter to District 17 Susan Spiker  Narrative Attachment Fiscal Officer 7  
  Narrative Attachment Median Income 8  
  Narrative Attachment County Census 9  
  Narrative Attachment OPWC Projects 10  
  Narrative Attachment Inter. CEDA, JEDD 11  
  Narrative Attachment Land Use Plan 12  
  Narrative Attachment DEFA 13  

 

OWDA Loan Application for Part A   OWDA 
2016 Division of Environmental & Financial Assistance (DEFA) 30 Year click on OhioEPA Logo to go there ohio epa logo
  Project Cost Breakdown  
  Certificate of Commitment and Encumbrance  
  DEFA Water Pollution Control 30 Year Loan Agreement all signatures  .
  LGA Payment Instructions Form  
  DEFA Water Pollution Control 30 Year Loan Agreement  .
  DEFA Water Pollution Control 30 Year Loan Agreement Signature of Solicitor  .
  DEFA Subordinated Revenue Bond  .
  DEFA General Certificate
  DEFA Legal Letter from Ashville's Solictor on the DEFA Agreement
1 Water Pollution Control 30 Year Loan Fund (WPCLF) Sewered Construction Application Submitted January 15, 2016 page 1-10  
2 Projection Schedule page 9  .
3 Authorization Ordinance  .  
4 Letter Site Opinion to DEFA Federal Relocation Assistance & Real Property  Acquisition Act of 1970  . 
Authorization Resolution 04-2015  .
6 Rate Structure Legislation and Documentation  .
7 OWDA Planning Loan and Loan Back-up .
8-a AECOM/URS Contract  .
8-b AECOM/URS Contract Continued  .
9 2013/14 Village of Ashville Audit .
9-a 2011/12 Village of Ashville Audit  .
9-b 2009/10 Village of Ashville Audit  .
9-2 2007/08 Village of Ashville Audit .

 

2016 Division of Environmental & Financial Assistance (DEFA) click on OhioEPA Logo to go there ohio epa logo
1 Water Pollution Control Loan Fund (WPCLF) Sewered Construction Application Submitted August 14, 2015 page 1-8
2 Projection Schedule page 9
3 Application Checklist page 10
4 Letter to DEFA Federal Relocation Assistance & Real Property  Acquisition Act of 1970
Authorization Resolution 04-2015
6 Rate Structure Legislation and Documentation
7 OWDA Planning Loan and Loan Back-up
8-a AECOM/URS Contract
8-b AECOM/URS Contract Continued
9-a 2012 Village of Ashville Audit 
9-b 2010 Village of Ashville Audit 
9-2 2008 Village of Ashville Audit 

 

Division of Environmental & Financial Assistance (DEFA) click on OhioEPA Logo to go there ohio epa logo
1 Water Pollution Control Loan Fund (WPCLF) Sewered Construction Application Submitted March 31, 2015 page 1-8
2 Projection Schedule page 9
3 Application Checklist page 10
4 Letter to DEFA Federal Relocation Assistance & Real Property  Acquisition Act of 1970
Authorization Resolution 04-2015
6 Rate Structure Legislation and Documentation
7 OWDA Planning Loan and Loan Back-up
8-a AECOM/URS Contract
8-b AECOM/URS Contract Continued
9-a 2012 Village of Ashville Audit 
9-b 2010 Village of Ashville Audit 
9-2 2008 Village of Ashville Audit 

 

2015 OhioEPA Permit Application for Water Resource Recovery Facility  ohio epa logo
1 EPA General Information Consolidated Permits   
2 Permit to Install (PTI)   
3 Notice of Intent (NOI)    OhioEPA NOI Approval
4 Permit Fee for NPDES    OhioEPA Permit Limits
Application for Modification of Ohio NPDES Permit   
6 Antidegradation Addendum Division of Surface Water   
7 Application for Permit to Discharge Wastewater NPDES Form 2A   
8 Application for Sewage Sludge Use or Disposal Form 2S   
9 OHioEPA Letter Pre-Construction Storm Water Inspection at Ashville WRRF June 16, 2015     

 

OWDA Linked by clicking on Logo Quarterly Reports   Village Council Minutes

AECOM Status Report

OWDA 2013 Council Minutes 2013  
2014  Council Minutes 2014  
Link to OWDA for Loan Information YTD 2015 Council Minutes YTD 2015

Report from AECOM

2014 Financial Information Form Rate Structure for 2014 Current Rate Structure

 

AECOM Public Presentation (URS) January 26, 2015  
PowerPoint in pdf format AECOM Council Agenda Figure 1
Figure 2 Building Plan  

 

Ohio Public Works Commission (OPWC) Application Round 30 Loan/Grant CQ39T
Loan
Loan Agreement Part B Part B Letter from OWPC Part B Promissory Note
 Part B Notification on Method of Disbursement  Part B Letter to OPWC
 

 

Ohio Public Works Commission (OPWC) Application Round 30 Loan/Grant General Exhibits
Application Received  
Loan/Grant Application for Part B Part B Engineer's Opinion on Cost Part B Fiscal Officer Revised 7  
Ohio WPCLF Nomination Form 2016 Part B Affordability Calculation  
Loan/Grant Application Loan/Grant Narrative District 17 Checklist
Loan Assistance Credit Enhancement Application Credit Enhancement Narrative District 17 Checklist
Application Exhibit 1 Narrative Attachment Census 1  Low & Moderate Income (LMI)
Application Exhibit 2 Narrative Attachment CIR5Y 2Narrative Attachment CIR5Y 2 FEMA - RIRM Pickaway County/Ashville
Application Exhibit 3 Narrative Attachment Findings & Orders 3 Letter to District 17 Susan Spiker
  Narrative Attachment URS/AECOM 4 Village of Ashville Resolution 13-2015
Cover - The Table of Content Narrative Attachment Rates 5  
Letter to District 17 Susan Spiker Narrative Attachment Facility Plan 6  
Letter to District 17 Susan Spiker  Narrative Attachment Fiscal Officer 7  
  Narrative Attachment Median Income 8  
  Narrative Attachment County Census 9  
  Narrative Attachment OPWC Projects 10  
  Narrative Attachment Inter. CEDA, JEDD 11  
  Narrative Attachment Land Use Plan 12  
  Narrative Attachment DEFA 13  

 

Ohio Public Works Commission (OPWC) Application Round 29 Loan/Grant General Exhibits
Loan/Grant Application Application Narrative District 17 Checklist
Loan Assistance Credit Enhancement Application Application Narrative District 17 Checklist
Application Exhibit 1 Narrative Attachment 1 Low & Moderate Income (LMI)
Application Exhibit 2 Narrative Attachment 2 FEMA - RIRM Pickaway County/Ashville
Application Exhibit 3 Narrative Attachment 3 OPWC - CIR Summary Form
  Narrative Attachment 4 Village of Ashville Resolution 13-2014
Cover - The Table of Content Narrative Attachment 5 OPWC ScoringOPWC Scoring
Letter to District 17 Susan Spiker Narrative Attachment 6  
  Narrative Attachment 7  
  Narrative Attachment 8  
  Narrative Attachment 9  
  Narrative Attachment 10  
  Narrative Attachment 11  
  Narrative Attachment 12  

 

Ohio Water Pollution Control Loan Fund (WPCLF)  
WPCLF Program Year 2014 Project Nomination Form  
WPCLF Program Year 2014 Project Nomination Form Update August 21, 2014
WPCLF Program Year 2014 Project Nomination Form Update September 9, 2014
WPCLF Program Year 2015 Project Nomination Form Extra Documents  
WPCLF Nutrient Reduction Discount Nomination Addendum  
WPCLF / OWDA Response Letter for Nomination  

The next phase is to obtain funding for the project from the Ohio Water Development Authority (OWDA). Below are the documents submitted to OWDA:

OWDA Loan Application Attachments
OWDA Checklist of Documents Required for OWDA Approval of Cooperative Financing Agreement  
General Certificate Rate Ordinance
Certified copy of Legislation for OWDA Loan 2012-06 Rate Minutes
OWDA Cooperative Agreement Amortization Schedule
Project Schedule Funding Application
URS Engineering Agreement for Planning Loan 2010 Census
Financial Information Form Annual Reports
Letter from Solicitor Census DataCensus Data

A second loan request has been submitted. This is for the construction of the facility. Below are those documents:

Ohio Water Pollution Control Loan Fund (WPCLF) Attachments
WPCLF Program Year 2014 Project Nomination Form  

 


URS and AECOM Information 

URS/AECOM  Construction Agreement
Agreement  

 

URS Public Presentation August 4, 2014  
PowerPoint in pdf format URS Council Agenda Figure 1
Figure 2 Figure 3 Utility Agenda
Operations Office Building    

 

Kick Off Meeting March 26, 2014  
Sign in Sheet URS Agenda Kick-Off Meeting Minutes
PP Presentation pdf URS Facility Draft  

 

Village Council, Mayor, and Staff went through an extensive process to evaluate Ashville's Facility. AECOM/URS was the engineering firm selected to make that evaluation. AECOM/URS was among twelve other firms that submitted proposals for Ashville's RFP.

AECOM/URS First Accessement Agreement Plant Design and Assistant Agreement
Accessment Agreement     Planning and Design Agreement  
URS Letter   Ashville Response Letter    
AECOM/URS Construction Monitoring Agreement    

If you are interested in the details of the URS Report click the indicated areas below:  

URS Report and News Figures Appendix
Report     2-1 A System Map  
Adopting Ordinance 2012-05   2-2 B Meeting Report  
Council Minutes for Adopting Ordinance   2-3 C Correspondence with OhioEPA  
Ordinance 2012-06 OWDA Loan   2-4 D CEDA Agreement  
Ordinance 2012-07 Planning & Design URS 4-1 E NPDES Permit  
  4-2 F Pickaway County East-West Connector
  4-3  
  4-4  
  4-5  
  4-6  

 

COM/URS Construction Monitoring Agreement    