SHED
Residents who would like to build a shed or install a prefab shed must complete the following prior to construction or installation:
• Complete the zoning permit application (Click Here). If the shed is over 200 SQ ft a Building permit is also required (Click Here)
• Drawing of fence location on plot plans from Pickaway Co Auditor (Click Here)
• Payment in cash or check (fee based on square footage breakdown at bottom of page)
Completed applications can be dropped off at our offices at 200 E Station St or emailed to This email address is being protected from spambots. You need JavaScript enabled to view it. .
Fees:
Zoning Permit : $50 + $5 per 100 square ft
Building Permit $50 + 1% tax
Cost Break Down
0-101 Square Feet -$55
101-200 Square feet- $60
201-300 Square feet- $115.50
301-400 Square Feet- $120.50
401-500 Square feet - $125.50
601-700 Square Feet - $130.50