bajfsdojfsdajfklasdjsssssssssssssssssssssssss                                                ssssssssss      s33ssssfklsdjfkCentral Ohio Air Quality 

For optimum phone homepage use landscape/turn sideways

Browser Menu To access use portrait

  • Vision

    Vision

    The Vision Statement guides Ashville. Council meetings start at 6:30 pm on the 1st & 3rd Monday of each month. Schedule: http://www.ashvilleohio.gov/index.php/village-government. Click on the Banner or Read More for Tribute Information for Mayor Wise. Read More
  • Public Hearing

    Public Hearing

    A Public Hearing is scheduled for annexation of 2.432+/- acres of property (D120001001077 & D1200010010605) on Long Street/Ashville Pike. For information for this or past events click the Banner or Read More. Read More
  • Alerts & Advisories

    Alerts & Advisories

    Go to http://local.nixle.com/zipcode/43103/ municipal/ or click on the Banner or Read More. Read More
  • Planning & Zoning Project

    Planning & Zoning Project

    The Village of Ashville with Crossroads Community Planning is updating its Planning & Zoning Codes. For more information click on image or "read more". Read More
  • Projects

    Projects

    Access information on projects for parks, streets, & utilities by clicking on the Banner or Read More. Please note that some projects may span years or may involve a combination of Ashville services. Read More
  •  Water Facility Project

    Water Facility Project

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Water Tower Project

    Water Tower Project

    The Village of Ashville is working on replacing the Cromley Water Tower with a North Water Tower. Click on read more or the banner for more information. Read More
  • Water Connection Projects

    Water Connection Projects

    Information about these projects are found by clicking on the Banner or Read More. Earnhart Hill & South Bloomfield(Completed) Water Connection. The webpage was developed to track and provide transparency to this process. Read More
  • Phase II of the State Route 316 Project

    Phase II of the State Route 316 Project

    The Phase II State Route 316 Project is from Station Street to SR 752. Click on Read More of the Banner to access more information. Read More
  • 2024 & 25 Paving Project

    2024 & 25 Paving Project

    Summary information on 2024 Randolph Street Paving Project. For more detailed information you can be linked to the project webpage by clicking on the Banner to the right or Read More Read More
  • Water Resource Recovery Facility Expansion

    Water Resource Recovery Facility Expansion

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Westside Park Project

    Westside Park Project

    Submitted Westside Park in 2022 and in 2024. Click on image or read more for Information. Read More
  • Park

    Park

    Information on Ashville Park development can be found by clicking on the Banner or Read More. We have been fortunate to benefit from Pickaway County Park District funding. Read More
  • Pedestrian Project

    Pedestrian Project

    Ashville & ODOT is funding a Pedestrian Enhanced Intersection Improvement Project. The intent is to add two (2) pedestrian signals and five (5) LED street lights. For more information click on the Banner or Read. Read More
  • South Metershed Project

    South Metershed Project

    Phase 1 of Improvement Project is funded by the Ohio Public Works Commission & the Ohio Department of Development (American Rescue Plan Act of 2021) for funding. For information click on the Banner or Read More. Read More
  • Resource Connection

    Resource Connection

    Resource information can be found by clicking on the Banner or Read More. This information includes transportation, food, computers, & connectivity, If you have an idea or information, please let us know. Read More
  • Financial Page

    Financial Page

    Financial ReportsThese reports include the Temporary and Permanent Expense Budgets, Anticipated Sources of Revenue Budget, Annual Financial Reports of the village and other financial information. Read More
  • CCR

    CCR

    Water Quality Report is also know as the Consumer Confidence Report (CCR). You can take a look at the report (s) by clicking on the Banner/Read More. Read More
  • Gas Aggregation

    Gas Aggregation

    Gas Aggregation is through Constellation NewEnergy - Gas Division, LLC. This was authorized by Ballot Question, legislation, & contract. For those documents, updates, & past information click on the Banner or Read More. Read More
  •  Ashville Foundation

    Ashville Foundation

    The purpose is to review its history, recruit members, elect officers, and approve by-laws. We encourage you to click on the Banner or Read More to get involved. Read More
  • Reporting Potholes

    Reporting Potholes

    If you see a pothole please call 740-983-6367 and report the location. To find out more about reporting potholes in Ashville, click the Banner or Read More. This will take you to our online reporting system. Read More
  • General Information

    General Information

    By clicking on this Banner or Read More you will find out more information on projects, events, and more. Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

Village of Ashville, Ohio

Out in the Field - Finding and Fixing I&I

How do you find I & I?

I & I is a result of groundwater or stormwater that flows into the sanitary sewer system due to leaky sewer lines or manholes or from situations where storm water can flow into the sanitary sewer system through direct connections, such as catch basins or roof drain connections. While there are two general approaches to finding and dealing with I & I, there are a variety of methods to determine if and where the problems are located.

Proactive Detection - Sewer System Evaluation Surveys (SSES)

Several sewer system tests can be used to examine the condition of individual sewers and identify I & I sources. These proactive detection tests are called sewer system evaluation surveys. A few of these tests include:   

Smoke Testing portions of the sanitary sewer pipes involves pumping smoke through sanitary sewers from utility holes in streets or within public easements and observing and documenting where smoke exits. Depending on the specific circumstances, the exiting smoke can indicate the location of a broken pipe, manhole, catch basin, or where roof or foundation drains might be connected to the sewer system, indicating where I & I inflow might enter the sanitary sewer system.

Dye Testing: By using a fluorizine dye, inappropriate connections can be determined. For instance, if a dye is introduced to a catch basin and the dye is then observed in the sanitary sewer downstream from that point, the evidence would indicate that that catch basin is directly connected to the sanitary sewer system.

TV Inspection: Recording conditions using a TV camera within the pipes. Closed Circuit TV (CCTV) cameras have been developed that can be slid down sanitary sewer lines and record a "movie picture" of the conditions that are found in that section of sewer. This can identify breaks, root intrusion, leaking water (especially infiltration from groundwater), and general deteriorating conditions. Estimates can be made for how much infiltration might occur from such leaks.

Flow Monitoring: Open channel flow monitors are used to gather sewer hydraulic information and are installed in manhole locations. Flow metering of the system provides the technical framework upon which a successful I & I program is built. This program will verifying the size and location of local collection systems, modeling and mini-basin configuration, flow meter location approval, traffic control and safety plans, permitting, and fieldwork scheduling.

Rainfall Monitoring: The accurate measurement and reporting of rainfall quantities is necessary to provide a credible basis for the flow data. The team will utilize the rainfall data collected from  rain gauges located throughout Ashville. The collected rain gauge data will be input and utilized to generate accurate rainfall quantities in the I & I control program area.

Passive Detection:  Finding I & I through passive detection methods is a process of observing and noting where sewer flow problems occur. A prime indicator of I & I problems can be identifying where sewage flow backs up in the sewer system. Such backups can occur at sewage treatment facilities or in homes or businesses through drains, toilets or sinks, because a surcharge occurs in the sanitary sewer line. A surcharge is where sewage flows full in a sewage pipe and creates a pressure condition inside the pipe. This situation can force water back upstream, including up sewer lines and out openings in homes and businesses. Sewage flows can also back up and fill manholes to overflowing, resulting in untreated sewage flows being released to the environment causing potential environmental and public health concerns. The I & I Control Program is intended to reduce the incidence of this occurring.

Ashville is designing an I & I program to: meter and identify I & I in the overall system; determine cost effective I & I options & removal methods; and ultimately design a long-term control program for I & I.

 

 Facebook Logo roundeddownloadphone-png-clipart-phone-icon-clipart-best-clipart-best-image-949-800.png

Govt/Employee Login