bajfsdojfsdajfklasdjsssssssssssssssssssssssss                                                ssssssssss      s33ssssfklsdjfkCentral Ohio Air Quality 

For optimum phone homepage use landscape/turn sideways

Browser Menu To access use portrait

  • Vision

    Vision

    The Vision Statement guides Ashville. Council meetings start at 6:30 pm on the 1st & 3rd Monday of each month. Schedule: http://www.ashvilleohio.gov/index.php/village-government. Click on the Banner or Read More for Tribute Information for Mayor Wise. Read More
  • 2023 Consumer Confidence Report

    2023 Consumer Confidence Report

    2023 Consumer Confidence Report Read More
  • Alerts & Advisories

    Alerts & Advisories

    Go to http://local.nixle.com/zipcode/43103/ municipal/ or click on the Banner or Read More. Read More
  • Planning & Zoning Project

    Planning & Zoning Project

    The Village of Ashville with Crossroads Community Planning is updating its Planning & Zoning Codes. For more information click on image or "read more". Read More
  • Projects

    Projects

    Access information on projects for parks, streets, & utilities by clicking on the Banner or Read More. Please note that some projects may span years or may involve a combination of Ashville services. Read More
  •  Water Facility Project

    Water Facility Project

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Water Tower Project

    Water Tower Project

    The Village of Ashville is working on replacing the Cromley Water Tower with a North Water Tower. Click on read more or the banner for more information. Read More
  • Water Connection Projects

    Water Connection Projects

    Information about these projects are found by clicking on the Banner or Read More. Earnhart Hill & South Bloomfield(Completed) Water Connection. The webpage was developed to track and provide transparency to this process. Read More
  • Phase II of the State Route 316 Project

    Phase II of the State Route 316 Project

    The Phase II State Route 316 Project is from Station Street to SR 752. Click on Read More of the Banner to access more information. Read More
  • 2024 & 25 Paving Project

    2024 & 25 Paving Project

    Summary information on 2024 Randolph Street Paving Project. For more detailed information you can be linked to the project webpage by clicking on the Banner to the right or Read More Read More
  • Water Resource Recovery Facility Expansion

    Water Resource Recovery Facility Expansion

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Westside Park Project

    Westside Park Project

    Submitted Westside Park in 2022 and in 2024. Click on image or read more for Information. Read More
  • Park

    Park

    Information on Ashville Park development can be found by clicking on the Banner or Read More. We have been fortunate to benefit from Pickaway County Park District funding. Read More
  • Pedestrian Project

    Pedestrian Project

    Ashville & ODOT is funding a Pedestrian Enhanced Intersection Improvement Project. The intent is to add two (2) pedestrian signals and five (5) LED street lights. For more information click on the Banner or Read. Read More
  • South Metershed Project

    South Metershed Project

    Phase 1 of Improvement Project is funded by the Ohio Public Works Commission & the Ohio Department of Development (American Rescue Plan Act of 2021) for funding. For information click on the Banner or Read More. Read More
  • Resource Connection

    Resource Connection

    Resource information can be found by clicking on the Banner or Read More. This information includes transportation, food, computers, & connectivity, If you have an idea or information, please let us know. Read More
  • Financial Page

    Financial Page

    Financial ReportsThese reports include the Temporary and Permanent Expense Budgets, Anticipated Sources of Revenue Budget, Annual Financial Reports of the village and other financial information. Read More
  • CCR

    CCR

    Water Quality Report is also know as the Consumer Confidence Report (CCR). You can take a look at the report (s) by clicking on the Banner/Read More. Read More
  • Gas Aggregation

    Gas Aggregation

    Gas Aggregation is through Constellation NewEnergy - Gas Division, LLC. This was authorized by Ballot Question, legislation, & contract. For those documents, updates, & past information click on the Banner or Read More. Read More
  •  Ashville Foundation

    Ashville Foundation

    The purpose is to review its history, recruit members, elect officers, and approve by-laws. We encourage you to click on the Banner or Read More to get involved. Read More
  • Reporting Potholes

    Reporting Potholes

    If you see a pothole please call 740-983-6367 and report the location. To find out more about reporting potholes in Ashville, click the Banner or Read More. This will take you to our online reporting system. Read More
  • General Information

    General Information

    By clicking on this Banner or Read More you will find out more information on projects, events, and more. Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

Village of Ashville, Ohio

 

STM/SAS 1 Roof drains. foundation drains and other clean water connections to the sanitary sewer system are prohibited on this project.

STM/SAS 2 All sanitary sewers constructed under this plan shall meet the requirements of the Village of Ashville, unless otherwise noted.

STM/SAS 3 the construction of new sanitary sewers or waterlines shall not begin until the Village receives an approved and current Ohio Environmental Protection Agency Permit to Install (PTI), or a letter of Acceptance.

STM/SAS 4. There shall be no sanitary sewer installed in rear or side lot easements without prior written approval from the Village of Ashville Wastewater Superintendent.

STM/SAS 5 The minimum requirements for sanitary sewer pipe shall be PVC sewer pipe ASTM D-3034, SDR 35 and ASTM F-679.

STM/SAS 6 The minimum requirement for storm sewer pipe shall be: 8" through 36" High Density Polyethylene N-12 or equal High Density Polyethylene Pipe with smooth interior wail. Storm drains larger than 36" shall meet the requirements of AASHTO M-294-S. Reinforced concrete RCP may be specified by the Engineer when they deem necessary.

STM/SAS 7 All trench backfill shall be compacted backfill as per cmsc item 911. the cost of oil compacted backfill shall be included in the price bid for furnishing and installing pipe. The contractor is hereby notified that the cmsc for Ashville requires the use of number 57 crushed limestone  Round Gravel for bedding of sanitary pipe.

STM/SAS 8 in addition to the requirements of cmsc item 901.08 as it refers to compacted backfill, there may be areas on the plans with the limits indicated on the profile view of the sewer as "compacted granular backfill". These areas will be compacted to meet the requirements of cmsc item 912.03. payment for the compaction of backfill within these areas shall be included in the price bid for furnishing and installing pipe.

STM/SAS 9 All bedding of sanitary sewer pipe shall conform to the typical trench detail.

STM/SAS 10 The contractor's specific attention is directed to the requirements of the leakage test. All sanitary sewers shall be tested for leakage in accordance with 901.20 of the City of Columbus Construction and Material Specifications. This is an exfiitration water test. An air test is permitted as Directed by the Village of Ashville. An infiltration test may be required in areas of high groundwater.

STM/SAS 11 Pipe for all six (6) inch house services shall be PVC sewer pipe, ASTM D-3034, SDR 35. All service extensions shall be laid at a 'minimum grade of two (2) percent and shall be constructed at the time of construction of the main sewer, unless otherwise directed by the Village Engineer. 

STM/SAS 12 Connections between existing and proposed service lines shall be completed using a four (4) inch or six (6) inch Fernco, Inc. Donut or Boot.

STM/SAS 13 A Wye pole made of 4" by 4" lumber shall be furnished and placed at all Wye branches and at the end of extended service. The cost of this work shall be included in the price bid for the sewer items.

STM/SAS 14 All sanitary sewer lines installed using PVC pipe will be. subject to deflection testing by pulling an approved mandrel equal in diameter to 95% of the pipe diameter through the pipe no less than (30) days after the pipe is backfilled.

STM/SAS 15 The Wye locations shown on the plans ore approximate and shall be field located during construction to serve the individual structures.

STM/SAS 16 Manhole covers for sanitary sewers shall conform to Village of Ashville Standard Drawings.

STM/SAS 17 Manhole tops shall be built or subsequently adjusted to meet surface grades established for the development. Cost of this work is to be included in the price bid for the various sewer items.

STM/SAS 18 All sanitary sewer lines shall end with manholes.

STM/SAS 19 All new sanitary sewer and storm drain manholes installed in the Village of Ashville Sanitary Sewer and Storm Drain Systems shall be as follows:

A. Pre-cast Concrete

B. Four (4) foot diameter, minimum

C. Installed with formed channels

STM/SAS 20 All new sanitary sewer manholes and existing sanitary manholes adjusted to grade shall be constructed with chimney seals and Dish in accordance with Village of ` Ashville Specifications.

STM/SAS 21 All new manholes and existing manholes adjusted to grade shall have concrete collars.

STM/SAS 22 Sanitary sewer--manhole connections: The sanitary sewer pipe to manhole connections shall be of a flexible watertight joint of approved manufacture. The joint may be of the following design (A) rubber sleeve with stainless steel banding, (B) rubber gasket compression, or (C) rubber gasket expansion.

STM/SAS 23 Manhole locations: The station and offset of the manholes shown on the plans are to the center of the manhole base.

STM/SAS 24 The maximum trench width shall not be greater than the outside diameter of the pipe plus two (2) feet.

STM/SAS 25 The contractor shall make provisions to maintain flows in the existing sewer at all times - during construction methods for maintaining

STM/SAS 26 All sanitary sewers shall be recorded in DVD format after construction prior to acceptance of the sewers by the Village of Ashville. The DVD shall remain the property of the Village of Ashville. The DVD shall clearly identify the location of the camera within the sewer, date and time of the DVD and be of sufficient quality to determine the conditions of the sanitary sewers. An additional DVD shall be performed just prior to the expiration of the one (1) year warranty period.

STM/SAS 27 The maximum velocity in any new sanitary sewer shall not exceed ten feet per second (10 fps).

STM/SAS 28 Testing of lateral connections shall be adhered to.

STM/SAS 29 The contractor shall make provisions to maintain flows in the existing sewer at all times - during construction methods for maintaining flows shall be submitted to the engineer for approval prior to construction. At no time will sanitary sewage be allowed to discharge to any river or stream nor spill out on the ground. Approval of plans by the engineer to maintain flows shall not relieve the contractor of any responsibility to adequately provide for all flows. The contractor shall be aware that the existing sewers may be operating under pressure (head) during times of rainfall: therefore the contractor shall exercise caution when working on these sewers. Payment for this work shall be included in the item bid for furnishing and installing pipe.

STM/SAS 30 The contractor shall submit to the Design Engineer and the Village Engineer for his or her review, five copies of shop drawings for all materials, structures, gradation certifications and equipment before any of the said materials, structures or equipment is ordered. The owner nor Village bare any responsibility to accept any of the above mentioned items without a completed review of said shop drawings. Shop drawings shall be approved by the Design Engineer prior to submittal to the Village Engineer. These documents shall be bound and indexed with numbered sheets for each item or pages numbered throughout.

STM/SAS 31 The minimum clearance between sanitary and water mains shall be ten (10) feet horizontal or one(1) foot six (6) inches vertical outside of pipe to outside of pipe.

Ashville, Ohio

SANITARY AND STORMWATER

SEWER NOTES

REV. 07-08-10

 