bajfsdojfsdajfklasdjsssssssssssssssssssssssss                                                ssssssssss      s33ssssfklsdjfkCentral Ohio Air Quality 

For optimum phone homepage use landscape/turn sideways

Browser Menu To access use portrait

  • Vision

    Vision

    The Vision Statement guides Ashville. Council meetings start at 6:30 pm on the 1st & 3rd Monday of each month. Schedule: http://www.ashvilleohio.gov/index.php/village-government. Click on the Banner or Read More for Tribute Information for Mayor Wise. Read More
  • 2023 Consumer Confidence Report

    2023 Consumer Confidence Report

    2023 Consumer Confidence Report Read More
  • Alerts & Advisories

    Alerts & Advisories

    Go to http://local.nixle.com/zipcode/43103/ municipal/ or click on the Banner or Read More. Read More
  • Planning & Zoning Project

    Planning & Zoning Project

    The Village of Ashville with Crossroads Community Planning is updating its Planning & Zoning Codes. For more information click on image or "read more". Read More
  • Projects

    Projects

    Access information on projects for parks, streets, & utilities by clicking on the Banner or Read More. Please note that some projects may span years or may involve a combination of Ashville services. Read More
  •  Water Facility Project

    Water Facility Project

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Water Tower Project

    Water Tower Project

    The Village of Ashville is working on replacing the Cromley Water Tower with a North Water Tower. Click on read more or the banner for more information. Read More
  • Water Connection Projects

    Water Connection Projects

    Information about these projects are found by clicking on the Banner or Read More. Earnhart Hill & South Bloomfield(Completed) Water Connection. The webpage was developed to track and provide transparency to this process. Read More
  • Phase II of the State Route 316 Project

    Phase II of the State Route 316 Project

    The Phase II State Route 316 Project is from Station Street to SR 752. Click on Read More of the Banner to access more information. Read More
  • 2024 & 25 Paving Project

    2024 & 25 Paving Project

    Summary information on 2024 Randolph Street Paving Project. For more detailed information you can be linked to the project webpage by clicking on the Banner to the right or Read More Read More
  • Water Resource Recovery Facility Expansion

    Water Resource Recovery Facility Expansion

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Westside Park Project

    Westside Park Project

    Submitted Westside Park in 2022 and in 2024. Click on image or read more for Information. Read More
  • Park

    Park

    Information on Ashville Park development can be found by clicking on the Banner or Read More. We have been fortunate to benefit from Pickaway County Park District funding. Read More
  • Pedestrian Project

    Pedestrian Project

    Ashville & ODOT is funding a Pedestrian Enhanced Intersection Improvement Project. The intent is to add two (2) pedestrian signals and five (5) LED street lights. For more information click on the Banner or Read. Read More
  • South Metershed Project

    South Metershed Project

    Phase 1 of Improvement Project is funded by the Ohio Public Works Commission & the Ohio Department of Development (American Rescue Plan Act of 2021) for funding. For information click on the Banner or Read More. Read More
  • Resource Connection

    Resource Connection

    Resource information can be found by clicking on the Banner or Read More. This information includes transportation, food, computers, & connectivity, If you have an idea or information, please let us know. Read More
  • Financial Page

    Financial Page

    Financial ReportsThese reports include the Temporary and Permanent Expense Budgets, Anticipated Sources of Revenue Budget, Annual Financial Reports of the village and other financial information. Read More
  • CCR

    CCR

    Water Quality Report is also know as the Consumer Confidence Report (CCR). You can take a look at the report (s) by clicking on the Banner/Read More. Read More
  • Gas Aggregation

    Gas Aggregation

    Gas Aggregation is through Constellation NewEnergy - Gas Division, LLC. This was authorized by Ballot Question, legislation, & contract. For those documents, updates, & past information click on the Banner or Read More. Read More
  •  Ashville Foundation

    Ashville Foundation

    The purpose is to review its history, recruit members, elect officers, and approve by-laws. We encourage you to click on the Banner or Read More to get involved. Read More
  • Reporting Potholes

    Reporting Potholes

    If you see a pothole please call 740-983-6367 and report the location. To find out more about reporting potholes in Ashville, click the Banner or Read More. This will take you to our online reporting system. Read More
  • General Information

    General Information

    By clicking on this Banner or Read More you will find out more information on projects, events, and more. Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

Village of Ashville, Ohio

STM 1 The minimum requirements for storm sewer pipe with the Village right-of-way or easements shall be reinforced concrete pipe ASTM C655 or ASTM C76 and non-reinforced concrete pipe ASTM C14 or corrugated polyethylene smooth lines M-294, Types S, as per Ohio Department of Transportation Construction and Material Specifications Item 707.

STM  2 Flexible storm sewers are subject to mandrel Testing and/or video inspection as directed by the Village Engineer. Testing shall be performed no sooner than thirty (30) days after the pipe trench has been backfilled and all roadway and site fills over the storm lines have been constructed. Maximum deflection shall not exceed 7.5% of the base inside diameter. Cost of testing shall be at the expense of the contractor.

STM  3 All storm manholes shall be marked with a 4” X 4” X 10’ – 0” pressure treated wooden post projecting 4’ – 0” above the finished grade and with the top 1’ – 0” painted green on four sides.

STM 4 The cost of any dewatering operations required for the construction of the storm sewer shall be included in the price BID for the various sewer items.

STM  5 The cost of any rock excavation shall be included in the price BID for the storm sewer. The bidder shall determine if any rock excavation will be required and adjust their BIDS accordingly.

STM  6 The flow in all sewers, drains, and watercourses encountered shall be maintained by the contractor at their own expense and whenever such watercourses and drains are disturbed or destroyed during the prosecution of the work, they shall be restored by the contractor at his own expense to a condition satisfactory to the engineer.

STM  7 All major flood routes and detention basins are to be surveyed by a registered surveyor to verify conformance to the approved grading plan. Cost of this work shall be at the expense of the contractor.

STM  8 Erosion control measures are to be installed by the contractor during construction to protect catch basins and curb inlets from silt, mud, and debris.

STM  9 All drainage flood routes, swales, and ditches are to be designed and graded with a minimum flow line grade of two (2) percent, and a maximum side slope of 4:1.

STM 10 All catch basins, manholes, and curb inlets shall have concrete channels poured in place to assure positive drainage through these structures.

STM 11 Public storm sewer manhole lids are to be east Jordan Iron Works Number 1660 – A2 or equivalent and embossed “Village of Ashville Storm Sewer”.

STM 12 Storm sewer curb inlets are to be adjusted within ¼” of plan elevation using steel shims.

STM 13 Pre-cast rings are to be used for all final adjustments of manhole castings. Storm manhole top of castings should be set at 1 – ½” above finished grade.

STM 14 Openings shall be provided in drainage structures to accommodate under drain outlets. Under drains are to be constructed in accordance with details given in the plans.

 Ashville, Ohio  STORMWATER NOTES REV. 07-08-10 

 

 Facebook Logo roundeddownloadphone-png-clipart-phone-icon-clipart-best-clipart-best-image-949-800.png

Govt/Employee Login