Part A of this project has been awarded to Peterson Construction. Part A involves the construction of the Water Resource Recovery Facility. Construction is underway. The following is a current construction schedule: |
To the right is a link to the pdf of the August 2017 construction schedule in a Classic Schedule Layout, click on image |
|
|
To the right is a link to the pdf of the April 2017 construction schedule in a Classic Schedule Layout, click on image. |
|
To the right is a link to the pdf of the March 2017 construction schedule in a Classic Schedule Layout, click on image. |
|
To the right is a link to the pdf of the past construction schedule in a Classic Schedule Layout, click on image. |
|