Residents who would like to build or install a prefab garage that are must complete the following prior to construction. 

• Complete the zoning permit application (Click Here) if shed is over 200 SQ ft a Building permit is also required (Click Here)
• Drawing of garage location on plot plans from Pickaway Co Auditor (Click Here)
• Payment in cash or check (fee based on square footage breakdown at bottom of page) 

• 2 copies of plans 

 

Fees:

Zoning Permit : $50 + $5 per 100 square ft

Building Permit $50 + $10 per 100 square feet 1% tax 

Completed applications can be dropped off at our offices at 200 E Station St or emailed to This email address is being protected from spambots. You need JavaScript enabled to view it..

Cost Break Down 

0-100     Square Feet -$55

101-200 Square feet-  $60

201-300 Square feet-  $145.80

301-400 Square Feet- $160.90

401-500 Square feet - $176.00

501-600 Square Feet -  $191.10

601-700 Square Feet -  $206.20

701-800 Square Feet - $221.30

 

All strucures over 768 sq ft will require a variance 

 

 

1175.01  GENERAL PROVISIONS.
   (a)   Height.  An accessory use or structure shall not exceed eighteen (18) feet in height.
   (b)   Location.  An unattached use or structure shall be located to the rear of the principal dwelling structure within any side or rear yard no closer than five (5) feet from any side or rear lot line in the RE or SR Districts, and four (4) feet in the VR, or VC District.
   (c)   Permitted Area.  The total area of all accessory uses or structures shall not exceed 768 square feet, except for swimming pools and tennis courts which shall be exempted from these area requirements. Not more than one (1) moveable storage building shall be allowed on any single residential property, and such structure shall comply with the location requirements of subsection (b) above.    (Ord. 2000-14.  Passed 7-24-00.)
1111.01  ZONING PERMITS.
   No building or other structure shall be erected, moved, added to, structurally altered, nor shall any building, structure, or land be established or changed in use without a zoning permit therefor, issued by the Zoning Inspector. The zoning permit shall certify that the proposed action is in conformance with this Ordinance.
1111.04  APPROVAL OF ZONING PERMITS.
   Within 30 days after the receipt, the application shall be either approved or disproved by the Zoning Inspector, unless the provisions of Section 1111.05, or other specific sections of this Ordinance apply. In taking action on a zoning permit application, the Zoning Inspector may bring the specific case to the Planning and Zoning Board for input. All zoning permits shall be conditional upon the commencement of work within one (1) year. One (1) copy of the application shall be returned to the applicant by the Zoning Inspector, after such copy is marked as either approved or disapproved and attested to same by the signature of the Zoning Inspector, or his/her designated agent, on such copy. In the case of disapproval, the Zoning Inspector shall state on the returned plans the specific reasons for disapproval. Two (2) copies of plans, similarly marked, shall be retained by the Zoning Inspector. One (1) copy retained by the Zoning Inspector shall be forwarded to the County Auditor upon issuance of a Certificate of Zoning Compliance along with one (1) copy of the application. The Zoning Inspector shall issue a placard, to be posted in a conspicuous place on the property in question, attesting to the fact that the use or alternation is in conformance with the provisions of this Ordinance.

1111.06  RECORD OF ZONING PERMIT.

   A record of all zoning permits shall be kept on file in the office of the Zoning Inspector and copies shall be furnished upon request to any persons having proprietary or tenancy interest in the building or land affected.

EXPIRATION OF ZONING PERMITS.

   If the work described in any zoning permit has not begun within one (1) year from the date of issuance thereof, or has not been completed within two (2) years from the date of issuance thereof, said permit shall expire; it shall be revoked by the Zoning Inspector. Written notice thereof shall be given to the persons affected, together with notice that further work as described in the expired permit shall not proceed unless and until a new zoning permit has been obtained or an extension has been granted by the Planning and Zoning Board.

 

 