bajfsdojfsdajfklasdjsssssssssssssssssssssssss                                                ssssssssss      s33ssssfklsdjfkCentral Ohio Air Quality 

For optimum phone homepage use landscape/turn sideways

Browser Menu To access use portrait

  • Vision

    Vision

    The Vision Statement guides Ashville. Council meetings start at 6:30 pm on the 1st & 3rd Monday of each month. Schedule: http://www.ashvilleohio.gov/index.php/village-government. Click on the Banner or Read More for Tribute Information for Mayor Wise. Read More
  • 2023 Consumer Confidence Report

    2023 Consumer Confidence Report

    2023 Consumer Confidence Report Read More
  • Alerts & Advisories

    Alerts & Advisories

    Go to http://local.nixle.com/zipcode/43103/ municipal/ or click on the Banner or Read More. Read More
  • Planning & Zoning Project

    Planning & Zoning Project

    The Village of Ashville with Crossroads Community Planning is updating its Planning & Zoning Codes. For more information click on image or "read more". Read More
  • Projects

    Projects

    Access information on projects for parks, streets, & utilities by clicking on the Banner or Read More. Please note that some projects may span years or may involve a combination of Ashville services. Read More
  •  Water Facility Project

    Water Facility Project

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Water Tower Project

    Water Tower Project

    The Village of Ashville is working on replacing the Cromley Water Tower with a North Water Tower. Click on read more or the banner for more information. Read More
  • Water Connection Projects

    Water Connection Projects

    Information about these projects are found by clicking on the Banner or Read More. Earnhart Hill & South Bloomfield(Completed) Water Connection. The webpage was developed to track and provide transparency to this process. Read More
  • Phase II of the State Route 316 Project

    Phase II of the State Route 316 Project

    The Phase II State Route 316 Project is from Station Street to SR 752. Click on Read More of the Banner to access more information. Read More
  • 2024 & 25 Paving Project

    2024 & 25 Paving Project

    Summary information on 2024 Randolph Street Paving Project. For more detailed information you can be linked to the project webpage by clicking on the Banner to the right or Read More Read More
  • Water Resource Recovery Facility Expansion

    Water Resource Recovery Facility Expansion

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Westside Park Project

    Westside Park Project

    Submitted Westside Park in 2022 and in 2024. Click on image or read more for Information. Read More
  • Park

    Park

    Information on Ashville Park development can be found by clicking on the Banner or Read More. We have been fortunate to benefit from Pickaway County Park District funding. Read More
  • Pedestrian Project

    Pedestrian Project

    Ashville & ODOT is funding a Pedestrian Enhanced Intersection Improvement Project. The intent is to add two (2) pedestrian signals and five (5) LED street lights. For more information click on the Banner or Read. Read More
  • South Metershed Project

    South Metershed Project

    Phase 1 of Improvement Project is funded by the Ohio Public Works Commission & the Ohio Department of Development (American Rescue Plan Act of 2021) for funding. For information click on the Banner or Read More. Read More
  • Resource Connection

    Resource Connection

    Resource information can be found by clicking on the Banner or Read More. This information includes transportation, food, computers, & connectivity, If you have an idea or information, please let us know. Read More
  • Financial Page

    Financial Page

    Financial ReportsThese reports include the Temporary and Permanent Expense Budgets, Anticipated Sources of Revenue Budget, Annual Financial Reports of the village and other financial information. Read More
  • CCR

    CCR

    Water Quality Report is also know as the Consumer Confidence Report (CCR). You can take a look at the report (s) by clicking on the Banner/Read More. Read More
  • Gas Aggregation

    Gas Aggregation

    Gas Aggregation is through Constellation NewEnergy - Gas Division, LLC. This was authorized by Ballot Question, legislation, & contract. For those documents, updates, & past information click on the Banner or Read More. Read More
  •  Ashville Foundation

    Ashville Foundation

    The purpose is to review its history, recruit members, elect officers, and approve by-laws. We encourage you to click on the Banner or Read More to get involved. Read More
  • Reporting Potholes

    Reporting Potholes

    If you see a pothole please call 740-983-6367 and report the location. To find out more about reporting potholes in Ashville, click the Banner or Read More. This will take you to our online reporting system. Read More
  • General Information

    General Information

    By clicking on this Banner or Read More you will find out more information on projects, events, and more. Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

Village of Ashville, Ohio

Building Advisory Board of Review

Name Area Phone
     
Mark Leatherwood General (740) 983-2036
Randy Cradebaugh HVAC (740) 207-1647
Doug Toole Electrical (614) 588-2178
Larry Hardbarger Plumbing (740) 474-7861
Dale Hoover Building Inspector (740) 207-5932

 

Planning & Zoning  Board Members:

 

This email address is being protected from spambots. You need JavaScript enabled to view it. 

Chairperson-This email address is being protected from spambots. You need JavaScript enabled to view it. 

                      This email address is being protected from spambots. You need JavaScript enabled to view it.

                      This email address is being protected from spambots. You need JavaScript enabled to view it.

                      This email address is being protected from spambots. You need JavaScript enabled to view it.

                      Mayor Nelson R. Embrey

This email address is being protected from spambots. You need JavaScript enabled to view it.

 

 

If you desire to operate as a contractor/subcontractor in the Village of Ashville, you are required to submit an APPLICATION FOR CONTRACTOR/SUB-CONTRACTOR REGISTRATION accompanied by the required documents and fee(s) ANNUALLY.

  • The Contractor Registration packet is available on line. You can download the application here or by clicking the link at the bottom of the page. If you still want the village to mail or fax you a packet, please contact the Building Department at (740) 983-6367 or you can pick one up at the counter of the Village Administrative Office.
  • It is the responsibility of the contractor to have the approved plans on site. The inspectors have been instructed to walk off the job if the drawings are not there for review. You will be required to reschedule your inspection and may be subjected to re-inspection fees.
  • Due to construction work occurring in the Village without permits, we are performing random inspections on the weekends. We are looking to eliminate contractors that come in over the weekends or work outside of the normal business hours that we are inspecting. Anyone found working without permits or lack of registration will be subject to fines. Registered contractors working without permits may have their license suspended or revoked.

Our goal is to protect the residents and ensure that construction projects are being monitored and the building and housing codes are being followed.

Please note: Counter hours for the Building Department will be from 8:00 am until 4:00 pm.

Contractor Registration Form and Instructions

 


Contact Information:

BUILDING DEPARTMENT
200 East Station Street
Ashville, Ohio 43103
Phone: (740) 983-6367   
FAX: (740) 983-4703

1 WML All waterline service saddles shall be double bolt stainless steel style 306 as manufactured by ROMAC, or equal.

WML 2 Location, support, protection and restoration of all water lines, services and appurtenances shall be the responsibility of the contractor. The contractor shall submit his details and methods of supporting the water lines across the sewer trench to the engineer for approval by the water department. Support method and detail approval shall be secured prior to the commencement of excavation operations.

WML 3 Water mains shall, where possible, be deflected around structures without the use of special fittings and without exceeding the manufacturer's allowable deflection.

WML 4 The contractor shall hand swab all pipe and fittings that are not otherwise disinfected. The amount of chlorine to be used during hand swabbing operations shall be determined by the Village of Ashville, water department.

WML 5 Any testing performed against existing valves shall be done at the contractor's risk and in strict compliance with the requirements of the engineer. If satisfactory test results cannot be obtained against an existing valve, the new line shall be disconnected from the existing line, plugged and re-tested. Damage caused to existing lines and valves shall be repaired by the contractor at his own expense.

WML 6 All cost to plug and block the ends of water mains at location shown In the plans shall be included in the price bid for pipe.

WML 7 Water service boxes shall be located 6" to 12" from the roadway right-of-way line, unless otherwise authorized by the Village Engineer.

WML 8 A detectable underground utility marking tape shall be installed approximately 18" Below Grade. This tape shall consist of a minimum 5 mil. Overall thickness, with a solid aluminum foil core, with, a 2 mil. clear film reverse print laminated to an aluminum foil to 2 mil. clear film, making the film permanently printed. Color code shall be blue indicating water and associated lines. The tape shall be manufactured to withstand alkaline, acidic and neutral soil conditions. Any directional bored pipe shall have a No. 6 braided wire, installed with the pipe. Cost shall be included with the price of pipe. No separate payment will be made.

WML 9 The contractor shall submit to the Village Engineer for review, five copies of shop drawings for all materials, structures, gradation certifications and equipment before any of the said materials, structures and equipment is ordered. The owner nor the Village of Ashville bear any responsibility to accept any of the above-mentioned items without a complete review of said shop drawings. The Shop drawings shall be approved by the Engineer Prior to submission to the village, these documents shall be bound into a folder with either an index with # of sheets for each item or pages identified throughout.

WML 10 All Water Pipes and Fittings, and methods of Construction and workmanship for Water Lines and Appurtenances shown in these plans should conform to the City of Columbus Construction and Material Specifications, Division 800 and applicable references therein, current on the date of contract, unless the requirements of such rules and regulations are upgraded or modified by the following notes or by the construction details set forth herein.

WML 11 Work Requiring the shutdown of existing water mains is to be coordinated. with the Village of Ashville water department forty-eight (48) hours prior to the Scheduled. work being performed. All effected customers shall be notified by the contractor at least twenty-four (24) hours prior to the shut down.

WML 12 water mains shall be ductile iron pipe designed in Accordance with the latest revisions of A.N.S.I./A.W.W.A. C150/A21.50 for a minimum 150 PSI (or project requirements, WHICHEVER is greater) rated working pressure plus a 100 PSI minimum surge allowance; A 2 to 1 factor or safety on the sum of working pressure plus surge pressure.

WML 13 Water mains shall be ductile iron pipe, class 52 (AWWA C151) with cement mortar lining and seal coating (AWWAC104) in accordance with Village Specifications. Joints shall be rubber gasket push-on mechanical (AWWA C111). Water main fittings shall be of ductile iron with cement mortar lining and seal coating with mechanical joints and shall conform to AWWA C153.

WML 14 Ductile iron pipe shall be Manufactured in the U.S.A. in accordance with the latest revision of A.N.S.I. /A.W.W.A. C151/A21.51. Each pipe shall be subject to a hydrostatic pressure test of at least 500 PSI at the point of Manufactured.

WML 15 Pipe shall have standard asphaltic coating on the exterior pipe shall also have a cement mortar on the interior in accordance with A.N.S.I. /A.W.W.A. C104/A21.4 of the latest revision.

WML 16 The class or nominal thickness, net weight without lining, and casting period shall be clearly marked on each length of pipe. Additionally, the manufacture’s mark, country where cast, year in which the pipe was produced, and letters “DI” or “Ductile” shall be cast or stamped on the pipe.

WML 17 PVC Plastic pipe, A.W.W.A. C900 DR 18 for sizes 4" TO 12" and A.W.W.A. C905 DR 18 for sizes 14" and above may be used only when approved by the Village of Ashville.

WML 18 All Piping two (2") inches or less in diameter between the water main and the control valve or  the meter pit shall be type K, soft Tempered, copper tubing conforming in all respects to A.S.T.M. 888. Fittings shall be high quality copper brass with AAWA approved compression type joints. In general, there will be no fittings permitted between the water main connection and the control valve.

WML 19 Dead end water lines shall terminate with a fire hydrant and a watch valve or two ¾ inch water service followed by sufficient length of water line to restrain the valve and shall be followed by a main line valve and an additional section of water lined plugged and blocked per the “Standard Drawings”.

WML 20 Waterlines shall be installed with a minimum of four (4) feet of cover measured for the finished grade to the top of the water main.

WML 21 All main line valves, hydrant watch valves, curb boxes and dead end lines are to be marked wtih a 4"x4"8'0" or 10'-0" Pressure treated wood post with 4'-0" Projecting above the finish grade and the top 1'-0" pointed blue on all four (4) sides.

WML 22 The contractor shall be responsible for the horizontal and vertical deflections or bends of the water lines in accordance with the manufacturer's specifications. Deflect water lines to provide 1'-6" vertical and 10'-0" horizontal clearance from sanitary and storm sewers.

WML 23 If there are any conflicts in grade between water lines and gravity sewers, the water lines shall be lowered during construction. Clearances stated must be maintained.

WML 24 A permit for each water service must be obtained from the Village of Ashville, prior to making a connection to the water service installed as part of this project and prior to making any additional taps into these water lines.

WML 25 The water service taps shall consist of all pipe, valves fittings and appurtenances required from and including the water main connection to and including the control valve and box or meter pit.

WML 26 The caps and inside of all mainline water valve boxes shall be painted blue, and the caps and Inside of all fire hydrant gate valve boxes shall be pointed red with two coats of rust inhibitive paint. Public fire hydrants are to be painted with two coats of Federal Safety Red, Sherwin Williams B54Y37 per Village of Ashville 1507.08(A)(1). Private Fire Hydrants are to be painted Federal Safety Red and White caps and bonnets per Village of Ashville 1507.14(B)(4). Hydrants places in a factory looped system shall be painted all Federal Safety Red.

WML 27 Tapping sleeves are to be Ford Meter Box Style FTSS all stainless steel or JCM 432 all stainless steel.

WML 28 All gate valves shall be ductile iron resilient wedge, two hundred and fifty (250) pounds per square inch (PSI), as manufactured by American Flow Control or approved equivalent which meets or exceeds the requirements of ANSI / AWWA C509.

WML 29 Valve boxes are to be Tyler 6500 screw type for main and watch valves with Ford F-1000 Corporation stops, and Tyler 94E Curb Boxes. valve boxes are to be heavy duty if located in paved areas. Control valves shall be Ford Z44-333 valves.

WML 30 Water main cleaning and flushing shall conform to item 801.11 CMSC.

WML 31 Hydrostatic tests (as required in section 5 of A.W.W.A C600) shall conform to item 801.12 CMSC. 33. Chlorinating of completed pipe line shall conform to item 801.13 CMSC.

WML 32 For water service taps, water main connection shall be made using Ford F-1000 corporation stops. Control valves shall be Ford Z44-333 valves.

WML 33 Water service boxes are to be located in Pairs along property lines. 8”-0” apart and 2’ – 0” outside of the right-of-way line, whenever practical.

WML 34 All water lines shall be tested (AWWA 600) and sterilized (AWWA C651) by the contractor in accordance with the Village of Ashville and AWWA Specifications. Testing shall be done under the supervision of the Village Engineer or his authorized representative at the contractor’s expense.

WML 35 It is the policy of the Village of Ashville that the design of the water distribution system improvements be such that the working pressure should not be less than thirty-five (35) pounds per square inch (PSI) during peak flow conditions, or minimum of twenty (20) PSI during peak flow plus fire flow conditions. Individual booster pumps for the purpose of raising supply line pressure shall not be permitted for non-single family residential application.

WML 36 the meter pit for single-family residential application, including all piping, fittings, equipment, and appurtenances are subject to approval by the Village of Ashville prior to installation. Meter pits unable to be provided with a gravity floor drain must be installed in a dedicated meter room. Gravity draws shall have a backflow prevention installed.

WML 37 The pressure required to perform hydrostatic testing on water lines must be 150 psi for domestic lines and 200 psi for fire suppression lines (per NFPA 13). Hydrostatic tests (as REQUIRED in Section 5 of AWWA C 600) shall conform to Item 801.12 CMSC.

WML 38 Chlorination of completed pipeline shall conform to Item 801.13 CMSC.ge of Ashville water department forty-eight.

Ashville, Ohio

WATER MAIN/LINE 

NOTES

REV. 07-08-10

 

 Facebook Logo roundeddownloadphone-png-clipart-phone-icon-clipart-best-clipart-best-image-949-800.png

Govt/Employee Login