This page is established to provide you information on this project. page updated November 21, 2017 page updated August 7 and July 3, 2017 >> photos on Part A & B progress
|
|
page updated April 14, 2017 >> Part A Schedule page updated February 17, 2017 >> Part B page updated February 17, 2017 >> Timeline page updated Novmeber 16, 2016 >> Loan Documents page updated November 2, 2016 >> Bid Documents page updated October 7, 2016 >> Pre-bid Agenda page updated August 25, 2016 >> Construction Schedule page updated August 4, 2016 >> OWPC Loan Contract and Information page updated October 10, 2016 >> Construction Photos page updated April 12, 2016 >> DEFA Loan Documents |
|
By clicking on many of the images below you can access pdfs of the items indicated.
|
A pdf version is available by clicking on above image.
The construction of the Water Resource Recovery Facility in Aerial Pictures |
The next page contains individual monthly photos
Aerial Photo from October 25, 2017 |
Aerial from June 22, 2017 |
Aerial photo from October 13, 2016 |
Aerial photo from May 5, 2016 |
Click on the image below to access the pdf of the PowerPoint presentation of Construction Photos for Part A |
The below pdfs are based upon sequence of time not on function.
|
||||||
|
||||||
Item | Link to Document |
A project schedule webpage has been developed. To tract where work is occurring both in calendar and map format click on the image to the right. | |
Click here for html Legal Notice on website |
|
Pre-Bid Agenda |
|
Pre-Bid Sign-in Sheet | |
Pre-Bid Minutes | |
Bid Sign-in Sheet |
|
Bid Documents |
|
Part B Specification | |
Plans for Part B Page 1-19 | |
Plans for Part B Page 20-31 | |
Part B Map of Effluent Line and Force Main | |
Plan Holders for Part B | |
AECOM Bid Comparison Letter |
|
Seven Bids SubmittedThe Engineer’s estimate of cost of construction was $1,686,230.00. The low bid did not exceed 10% of the Engineer’s Estimate. The bids ranged from 11.7% below to 31.8% above the estimate. The three (3) lowest bids were reviewed for conformance with the bidding requirements of the Contract Documents and comments. |
Fields Excavating, Inc. $1,489,605.15 Sam’s Excavating Unlimited, Inc. $1,603,889.04 Darby Creek Excavating, Inc. $1,649,278.42 Tribute Contracting and Consultants LLC $1,788,306.40 Rock River Construction, LTD. *$1,853,729.00 Southern Ohio Trenching & Excavating Inc. $2,153,706.95 Shelly and Sands, Inc. $2,222,502.00 *corrected bid amount |
Bid Submitted by Fields Excavating, Inc. |
|
Bid Submitted by Sam's Excavating Unlimited, Inc. |
|
Bid Submitted by Darby Creek Excavating, Inc. |
|
Resolution Authorizing Contract |
|
Notice of Commencement of Public Improvement Section 1311.252 ORC |
|
OPWC Request to Proceed | |
OPWC Approved Request to Proceed | |
OWDA Application for Part B | |
Insurance | |
Notice of Award |
|
Construction Agreement |
|
Pre-Construction pdf of PowerPoint |
|
Pre-Construction Meeting Sign-in |
|
Pre-Construction Agenda |
|
Pre-Construction Minutes |
|
Pre-Construction Drawings |
|
Notice of Commencement of Public Improvement |
|
Notice to Proceed |
|
Schedule |
|
Contact List |
|
Emergency Contact List |
Click on the image below to access a pdf of the PowerPoint Presentation for the indicated dates:
Updated 04/09/2024
Clarification No. 2 Date April 8, 2024
Updated 03/25/2024
1004 Clarification Letter from Tebbe Engineering
Updated 03/21/2024
Addendum 1 Tebbe Civil Engineering
Updated 03/13/2024
Circleville Herald Public Notice
https://www.publicnoticesohio.com/?activeNotice=9e44292f01b0a13897d6ee0138c8e06a
Ashville QBS lIst for SOQ & LOI (DRAFT)
Strand Assoicates Report Exhibit for Resolution 08-2022
Stand Assoicates Report Exhibit for Resolution 11-2022
This page is established to provide you information on this project. page updated November 21, 2017 page updated August 7 and July 3, 2017 >> photos on Part A & B progress
|
|
page updated April 14, 2017 >> Part A Schedule page updated February 17, 2017 >> Part B page updated February 17, 2017 >> Timeline page updated Novmeber 16, 2016 >> Loan Documents page updated November 2, 2016 >> Bid Documents page updated October 7, 2016 >> Pre-bid Agenda page updated August 25, 2016 >> Construction Schedule page updated August 4, 2016 >> OWPC Loan Contract and Information page updated October 10, 2016 >> Construction Photos page updated April 12, 2016 >> DEFA Loan Documents |
|
By clicking on many of the images below you can access pdfs of the items indicated.
|
A pdf version is available by clicking on above image.
The construction of the Water Resource Recovery Facility in Aerial Pictures |
The next page contains individual monthly photos
Aerial Photo from October 25, 2017 |
Aerial from June 22, 2017 |
Aerial photo from October 13, 2016 |
Aerial photo from May 5, 2016 |
Click on the image below to access the pdf of the PowerPoint presentation of Construction Photos for Part A |
The below pdfs are based upon sequence of time not on function.
|
||||||
|
||||||
Item | Link to Document |
A project schedule webpage has been developed. To tract where work is occurring both in calendar and map format click on the image to the right. | |
Click here for html Legal Notice on website |
|
Pre-Bid Agenda |
|
Pre-Bid Sign-in Sheet | |
Pre-Bid Minutes | |
Bid Sign-in Sheet |
|
Bid Documents |
|
Part B Specification | |
Plans for Part B Page 1-19 | |
Plans for Part B Page 20-31 | |
Part B Map of Effluent Line and Force Main | |
Plan Holders for Part B | |
AECOM Bid Comparison Letter |
|
Seven Bids SubmittedThe Engineer’s estimate of cost of construction was $1,686,230.00. The low bid did not exceed 10% of the Engineer’s Estimate. The bids ranged from 11.7% below to 31.8% above the estimate. The three (3) lowest bids were reviewed for conformance with the bidding requirements of the Contract Documents and comments. |
Fields Excavating, Inc. $1,489,605.15 Sam’s Excavating Unlimited, Inc. $1,603,889.04 Darby Creek Excavating, Inc. $1,649,278.42 Tribute Contracting and Consultants LLC $1,788,306.40 Rock River Construction, LTD. *$1,853,729.00 Southern Ohio Trenching & Excavating Inc. $2,153,706.95 Shelly and Sands, Inc. $2,222,502.00 *corrected bid amount |
Bid Submitted by Fields Excavating, Inc. |
|
Bid Submitted by Sam's Excavating Unlimited, Inc. |
|
Bid Submitted by Darby Creek Excavating, Inc. |
|
Resolution Authorizing Contract |
|
Notice of Commencement of Public Improvement Section 1311.252 ORC |
|
OPWC Request to Proceed | |
OPWC Approved Request to Proceed | |
OWDA Application for Part B | |
Insurance | |
Notice of Award |
|
Construction Agreement |
|
Pre-Construction pdf of PowerPoint |
|
Pre-Construction Meeting Sign-in |
|
Pre-Construction Agenda |
|
Pre-Construction Minutes |
|
Pre-Construction Drawings |
|
Notice of Commencement of Public Improvement |
|
Notice to Proceed |
|
Schedule |
|
Contact List |
|
Emergency Contact List |
Click on the image below to access a pdf of the PowerPoint Presentation for the indicated dates: