bajfsdojfsdajfklasdjsssssssssssssssssssssssss                                                ssssssssss      s33ssssfklsdjfkCentral Ohio Air Quality 

For optimum phone homepage use landscape/turn sideways

Browser Menu To access use portrait

  • Vision

    Vision

    The Vision Statement guides Ashville. Council meetings start at 6:30 pm on the 1st & 3rd Monday of each month. Schedule: http://www.ashvilleohio.gov/index.php/village-government. Click on the Banner or Read More for Tribute Information for Mayor Wise. Read More
  • 2023 Consumer Confidence Report

    2023 Consumer Confidence Report

    2023 Consumer Confidence Report Read More
  • Alerts & Advisories

    Alerts & Advisories

    Go to http://local.nixle.com/zipcode/43103/ municipal/ or click on the Banner or Read More. Read More
  • Planning & Zoning Project

    Planning & Zoning Project

    The Village of Ashville with Crossroads Community Planning is updating its Planning & Zoning Codes. For more information click on image or "read more". Read More
  • Projects

    Projects

    Access information on projects for parks, streets, & utilities by clicking on the Banner or Read More. Please note that some projects may span years or may involve a combination of Ashville services. Read More
  •  Water Facility Project

    Water Facility Project

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Water Tower Project

    Water Tower Project

    The Village of Ashville is working on replacing the Cromley Water Tower with a North Water Tower. Click on read more or the banner for more information. Read More
  • Water Connection Projects

    Water Connection Projects

    Information about these projects are found by clicking on the Banner or Read More. Earnhart Hill & South Bloomfield(Completed) Water Connection. The webpage was developed to track and provide transparency to this process. Read More
  • Phase II of the State Route 316 Project

    Phase II of the State Route 316 Project

    The Phase II State Route 316 Project is from Station Street to SR 752. Click on Read More of the Banner to access more information. Read More
  • 2024 & 25 Paving Project

    2024 & 25 Paving Project

    Summary information on 2024 Randolph Street Paving Project. For more detailed information you can be linked to the project webpage by clicking on the Banner to the right or Read More Read More
  • Water Resource Recovery Facility Expansion

    Water Resource Recovery Facility Expansion

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Westside Park Project

    Westside Park Project

    Submitted Westside Park in 2022 and in 2024. Click on image or read more for Information. Read More
  • Park

    Park

    Information on Ashville Park development can be found by clicking on the Banner or Read More. We have been fortunate to benefit from Pickaway County Park District funding. Read More
  • Pedestrian Project

    Pedestrian Project

    Ashville & ODOT is funding a Pedestrian Enhanced Intersection Improvement Project. The intent is to add two (2) pedestrian signals and five (5) LED street lights. For more information click on the Banner or Read. Read More
  • South Metershed Project

    South Metershed Project

    Phase 1 of Improvement Project is funded by the Ohio Public Works Commission & the Ohio Department of Development (American Rescue Plan Act of 2021) for funding. For information click on the Banner or Read More. Read More
  • Resource Connection

    Resource Connection

    Resource information can be found by clicking on the Banner or Read More. This information includes transportation, food, computers, & connectivity, If you have an idea or information, please let us know. Read More
  • Financial Page

    Financial Page

    Financial ReportsThese reports include the Temporary and Permanent Expense Budgets, Anticipated Sources of Revenue Budget, Annual Financial Reports of the village and other financial information. Read More
  • CCR

    CCR

    Water Quality Report is also know as the Consumer Confidence Report (CCR). You can take a look at the report (s) by clicking on the Banner/Read More. Read More
  • Gas Aggregation

    Gas Aggregation

    Gas Aggregation is through Constellation NewEnergy - Gas Division, LLC. This was authorized by Ballot Question, legislation, & contract. For those documents, updates, & past information click on the Banner or Read More. Read More
  •  Ashville Foundation

    Ashville Foundation

    The purpose is to review its history, recruit members, elect officers, and approve by-laws. We encourage you to click on the Banner or Read More to get involved. Read More
  • Reporting Potholes

    Reporting Potholes

    If you see a pothole please call 740-983-6367 and report the location. To find out more about reporting potholes in Ashville, click the Banner or Read More. This will take you to our online reporting system. Read More
  • General Information

    General Information

    By clicking on this Banner or Read More you will find out more information on projects, events, and more. Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

Village of Ashville, Ohio

TAP Safety Program  

Updated March 18, 2024

PIC - 117460-GENSUM 3-18-2024

1114- PID-117460 Tebbe Plan

Updated January 2024

2024 January Quarterly Meeting

01-PIC Ashville Ped Improvement PID117460

117460 Stage 3

117460 S3 HG

117460 S3 WC

2024-01-18 PIC Ashville Ped Improve_PID117460_S3 - 667-909-594

Crystal Reports ActiveX Designer - Estimator Estimate Detailed Report

PIC-Ashville-Ped Improv ROW Certification 117460

PID117460 PIC-Ashville-Ped Improv Plans 12-15-23

Updated December 2023

Ordinance 2023-12 An Ordinance To Approve the Preliminary Participatory Legislation Based Upon RC 5521.01 for Project PID No. 117460 County/Route/Section PIC-Ashville-Ped Improve, and Declaring an Emergency

Right of Way Certificate

PIC-Ashville-Ped Improv, 117460 ODOT RW Cert.


TAP Safety Program

Updated October 25, 2023

PID 117460 PIC-Ashville-Ped Improve ODOT-let LPA Agreement

October 24, 2023 Quaterly Meeting with ODOT for PID 117460 PIC-ASHVILLE-PED

September 26, 2023 Update to Stage 2 Project Plan

Updated April 26, 2023

April 10, 2023 Quaterly Meeting with ODOT for PID 117460 PIC-ASHVILLE-PED

April 10, 2023 Meeting Schedule

CORPO/MORPC April 12, 2023 Meeting on PID 117460 PIC 

Updated December 7, 2022

Proposed Schedule for PID 117460 PIC-ASHVILLE-PED

Updated September 30, 2022

LPA Scope of Services Form (ODOT)

Kick-off-meeting Notes from Sepember 20, 2022

Agenda for September 20, 2022

Updated May 6, 2022

ODOT Award Letter May 3, 2022

Village of Ashville Response to Award Letter May 5, 2022 

LPA D6 Scope of Services Form


TAP Safety ProgramUpdated January 4, 2022

PDF of Formstack Application

Exhibit One Certified Engineer Estimate of Construction

Exhibit Two Employment Data for TAP

Exhibit Three ODOT Traffic Study for State Route 316 Project

Attachment One Engineering Plan and State Route 316 Project

Attachment Two Land Use Plan Sidewalk & Trail Plan

Attachment Three Certified Census and Projected Growth

Attachment Four Legislation-Ordinance Resolution

Attachment Five Letter to Certify Funding TAP 2021/22

Attachment Six Application Letter to Jeff Shaner

Attachment Seven TAP Cover Table of Content Application

Attachment Eignt TAP Cover Table of Content Letter of Interest

Text For Formstack on-line Application


TAP Safety ProgramUpdated October 28, 2021

Screenshot of Letter of Interest

Cover Letter, Table of Content, and Letter to Jeff Shaner 

Attachment One Village of Asvhille Engineer's Detailed Map

Attachment Two Village of Ashville Growth Areas

Attachment Three ODOT, OPWC, Ashville State Route 316 Project

Attachment Four Certified Census and Projected Ashville Growth

Attachment Five Pickaway County and MORPC Regional Map

Attachment Six Land Use Plan Sidewalk and Trail Plan

Attachment Seven Certified Engineer Estimate of Construction

Attachment Eignt Certified Copy of Legislation

Attachment Nine Fiscal Officer Funds Certification


TAP Safety ProgramVillage of Ashville

200 Station Street East
Ashville, Ohio 43103
Office:  740-983-6367

Fax: 740-983-4703

Website: www.ashvilleohio.gov

  • Charles Wise, Mayor

Email:  This email address is being protected from spambots. You need JavaScript enabled to view it.

  • Franklin Christman, Village Administrator

Office:  740-983-7132

Cell: 740-207-1842
Email:  This email address is being protected from spambots. You need JavaScript enabled to view it.

  • April Grube, Fiscal Officer

Office:  740-983-7131
Email:  This email address is being protected from spambots. You need JavaScript enabled to view it.

 

From: Tebbe Civil Engineering, LLC

5792 Gaelic Court

Dublin, Ohio 43016-2237

  • Christopher M. Tebbe, P.E.

Project Engineer, Designer, and Manager 

Phone: 614-704-6457

Email:  This email address is being protected from spambots. You need JavaScript enabled to view it.

Website: www.tebbecivil.com  

Water Facility Project

Updated March 8, 2024

Updated General Plan Pages 1-45

Updated General Plan Pages 45-131

Jones & Henry Engineers, LTD Response Letter to OhioEPA

OhioEPA December 14, 2023 Letter with questions concerning General Plan submission

First The General Plan submission, click list box to the upper right. 


Updated February 20, 2024

0-Nomination Checklist

1-Tab Borrower Information

2-Tab Contact & Funding Information

3-Tab WSRLA Information

5-Tab Project Schedule

6-Exhibit Maps, Teays Valley Aquifer, Drawings, & Description

7-Exhibit Ordinance 2022-12 Jones & Henry Agreement

8-Exhibit Quote & Contractor

9-Exhibit Water & Wastewater Rate Legislation, Documents, & Source Funding


Updated January 31, 2024

Ashville Well Abandonment Grant PWS Grant Application

Ashville Well Abandonment Grant PWS Submittal Confirmation

Ashville Exhibit Quote & Contractor

Ashville Exhibit Maps, Teays Valley Aguifer, & Drawings

Ashville Exhibit Water & Wastewater Rates Update with Projections


Updated December 19, 2023

Cover Letter to Representative Stewart

FY25-26 Capital Budget Project Information Worksheet (Ohio State Capital Worksheet)


Date Updated June 7, 2023

The General Plan for the OhioEPA

The General Plan Pages 1-37

The General Plan Appendix A

The General Plan Appendix B

The General Plan Appendix C

Elements of a OhioEPA General Plan

 

 

 

 

 

2022 Water Project Facility


Agenda

January 10, 2022

January 18, 2022

February 7, 2022

Minutes 

January 18, 2022

March 21, 2022

April 19, 2022

April 26, 2022

Schedule:

January 18, 2022 at 2:30 pm Council Room     
 February 7, 2022 at 5:00 pm Coiuncil Room            
 March 14, 2022 following Committee of the Whole at 6:30 pm   March 22, 2022 at 1:00 pm Council Room 
 April 11, 2022 following Committee of the Whole at 6:30 pm    April 19, 2022 at 2:30 pm Council Room
 May 9, 2022 following Committee of the Whole at 6:30 pm    May 17, 2022 at 2:30 pm Council Room
June 13, 2022 following Committee of the Whole at 6:30 pm   June 21, 2022 at 2:30 pm Council Room

 


Updated March 15, 2022 

Submitted Statement (s) of Qualification (s) and Interest

DLZ

Jones & Henry Engineers

Strand Associates

 Updated February 8, 2022

Press Release - Public Notification

Ashville Specifications List 

 

Ashville Criteria List 

Preliminary Scope of Services

   

Schedule of Activities

Qualifications Evaluation Criteria

 

Request for Statements of Qualifications & Interest

Reference Check Form

 

Qualifications Evaluation Summary

Short-List Highest Qualified Architecture/Engineering Firms (A/E)                                          

 

Pickaway Auditor Link to 140 Park Street Location

OhioEPA Survey January 11, 2022

 

Ohio Revised Code 153.65 on Professional Selection Process

Consumer Confidence Report (CCR)     American Council of Engineering Companies (ACEC) Qualifications-Based Selection (QBS)

Updated January 11, 2022

Cover

Ohio QBS Manual 2013

Ashville QBS Forms

SOQ Specification and Criteria



Date Updated June 7, 2023

Submitted Proposals

Jones & Henry Engineers, Ltd.

Strand Associates

DLZ

Shortlist Firms 

Shortlist Interviews

Jones & Henry Engieers, Ltd. Interview

Strand Associates Interview

Selection 

Utility Committee Recommendation for Engineering Firm Minutes



 Tab 1 Application

Date Updated


Date Updated


Tab 3 Contact Information 

From: Village of Ashville

Village of Ashville

200 Station Street East
Ashville, Ohio 43103
Office:  740-983-6367

Fax: 740-983-4703

Website: www.ashvilleohio.gov

  • Nelson R. Embrey II, Mayor

Email:  This email address is being protected from spambots. You need JavaScript enabled to view it.

  • Franklin Christman, Village Administrator

Office:  740-983-7132

Cell: 740-207-1842
Email:  This email address is being protected from spambots. You need JavaScript enabled to view it.

  • April Grube, Fiscal Officer

Office:  740-983-7131
Email:  This email address is being protected from spambots. You need JavaScript enabled to view it.

  • Jim Welsh, Chief of Water Operation

Cell: 614-214-9223

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.  

From: Tebbe Civil Engineering, LLC

4700 Lakehurst Court, Suite 135

Dublin, Ohio 43016

  • Christopher M. Tebbe, P.E.

Project Engineer, Designer, and Manager 

Phone: 614-845-5885

Cell: 614-704-6457

Email:  This email address is being protected from spambots. You need JavaScript enabled to view it.

Website: www.tebbecivil.com  


Link to Ashville Earnhart Hill Waterline Connection Project

Link to Ashville Water Tower Project

 Westside Park Banner

Updated March 1, 2024

2024 CDBG Grant Proposal Westside Park

Exhibit One Location & Aerials

Exhibit Two Concept Plans

Exhibit Three Detailed Description

Exhibit Four Quote

Exhibit Five Households, 212 Census Track, Group 3, LMI, Census Track, Block Group Data

Exhibit Six Legislation for Impact Fees

Exhibit Seven CDBG Resolution 02-2024 & Other Legislation

Exhibit Eight Certification of Funds & 2024 Permanent Expese Appropriation Budget


2020 CDBG

Updated March 10, 2022 

Item Date Link/PDF File
Cover    picture2
CDBG Grant Application 2022 Complete with Exhibits    mh900439818
Exhibit A - Detailed (Maps)        mh900439818
Exhibit B - LMI Pickaway County, Ashville Information  Updated    2013 exhibit c
Exhibit C - Engineering Cost Estimate   exhibit f engineering
Exhibit D - Resolution          Resolution
Exhibit D - Fund Certification   exhibit e certificate

Exhibit E - LMI Summary 

Census Block Group

Cenus Tract 

  update pin
Exhibit F - FEMA Floodplain Map   2013 exhibit d
Exhibit G - CDIS    exhibit g planning

Item  
Schedule not yet established  

Legal Notice

circleville herald 
1 - Bid Document  mh900439818
Bid Submitted by   mh900439818
Notice of Award   picture2
Resolution Authorizing Contract 2013 exhibit a
CDBG Construction Agreement  update pin
Project Letter to Residents  update pin
Pre-Construction Meeting Sign-in  
Davis Bacon Revised Rates  

Updated November 7, 2016

Updated on November 8, 2016 with photos of project

Updated on May 23, 2016 with revised time-line and intersection as a 4-Way Stop. 

his page is created to keep you informed about the intersection improvement at State Route 752 and Long Street.  The project has received funding from the Ohio Public Works Commission - $500,000 Grant and $325,108 Loan over 20 years. Below is the application and the attachments that provided the information resulting in approval of the Grant/Loan:opwc sign


Revised timeline below: Click on image will open pdf of "Timeline", OPWD "Request to Proceed", and revised schedule.

Utility work resumed on May 9, 2016 the below photos reprsent work by South Central Power, click on cover to access pdf file.

 

 

 

 

 

 


Project Work in Photos

Album September 2017

Album May June

Picture1

November29          January 2016
     
April 20 24 2017    

 

 

 

 

 

 

 

 

 

 


Four Way Stop

One of our longer and complicated projects is nearing completion. On November 18, 2013 the village had a Pre-Construction meeting with Decker to begin work at the intersection of St. Rte. 752 and Long Street.

Since then, the utility companies have worked to bury the utility cables. That process is near completion. The utility work will be completed by June 17th. Decker Construction will be returning to complete the project after July 4th. They will complete the project by September 22, 2016.

When the utilities are buried there will be no support for the traffic signal. Therefore, this intersection will temporarily become a four way stop, see below diagram.

The new signal will be installed as part of the project with a automated pedestrian cross walk. 

            4way 

Decker Construction arrived in the village to work on stormwater. They will be in the village for 3 to 4 weeks. Please contact thte office if you have any questions. 


Project Timeline

 

time lin

presentation schedule time line

time line for 752 and long

Click on the image above for a pdf version


Ohio Public Works Commision (OWPC)

Click on the image to the right for the Public Notice for the Project: notice opwc long street 752

september 17 2013 circleville herald notice for long and strt 752 opwc

Circleville Herald Public Notice on October 17, 2013     Circleville Herald Public Notice on October 24, 2013

Application for Financial Assistance Narrative for OPWC Application Updated Response to 10-Item Narrative for
OPWC Small Grant Program
Attachment 1 - Village of Ashville Feb. 3, 2010 Amended Official
Certificate of Estimated Resources
Attachment 2a - Village of Ashville 2009
July Unemployment Rates & Rankings
Attachment 2b - Village of Ashville 2010 Feb.
Unemployment Rates & Ranking
Attachment 3 - Village of Ashville Accident History Attachment 4 - Village of Ashville Circleville
Herald March 3, 2010 Page One
Attachment 4 - Village of Ashville Circleville
Herald March 3, 2010 Page Three
Attachment 5 - Village of Ashville 2000 Census Median
Household Income in 1999
Approval Letter from OPWC OPWC Agreement

Bid Documents for PIC-752/Long Street Improvements OPWC Project CT72N/CT73N below

PIC-752/Long Street Improvements OPWC Bid Book Addendum #2 Drawings #1
Drawings #2 Traffic Drawings and Information Appendix A
OPWC Information Prevailing Wage  

 

Contract for PIC-752/Long St. Improvements OPWC Project CT72N/CT73N below

Contract Decker Construction & Village of Ashville 12-2013 Resolution Village of Ashville Request to Proceed
Notice to Proceed from OPWC Connnect to Decker Construction  
Pre-Construction Meeting    

The Stormwater Center Alley Project is not directly part of the above project but was added to improve water drainage in the same area. The ($92,000) Center Alley Project has begun. Click on the following icon to read the letter sent to the residents in the area:

envelope center alleyThe letter encourage residents and businesses in this area to contact Franklin Christman at 740/983-7164 if they are interested in connecting to this stormwater main. This connection could include gutters, sump pumps, and yard drains.

February 10, 2012 Cox Paving has completed from South Street to Hall Street. Columbia Gas will be doing some line work between Hall Street and State Route 752 during the early part of February 13.

On February 20, 2012 Cox Paving is now north of Hall Street moving toward State Route 752.

The Village of Ashville is working with South Central Power, Frontier Communication, and Time Warner to remove all poles that are located at this intersection. Meetings have been very encouraging.

 


The 2009 drawing below represents the early concept for revising the intersection of State Route 752 and Long (316) Street. An engineering firm is refining this drawing. When it is available it will replace the one below. By clicking on the image you can download a pdf that is more well-defined.

early layout webpage

 

 Facebook Logo roundeddownloadphone-png-clipart-phone-icon-clipart-best-clipart-best-image-949-800.png

Govt/Employee Login