bajfsdojfsdajfklasdjsssssssssssssssssssssssss                                                ssssssssss      s33ssssfklsdjfkCentral Ohio Air Quality 

For optimum phone homepage use landscape/turn sideways

Browser Menu To access use portrait

  • Vision

    Vision

    The Vision Statement guides Ashville. Council meetings start at 6:30 pm on the 1st & 3rd Monday of each month. Schedule: http://www.ashvilleohio.gov/index.php/village-government. Click on the Banner or Read More for Tribute Information for Mayor Wise. Read More
  • 2023 Consumer Confidence Report

    2023 Consumer Confidence Report

    2023 Consumer Confidence Report Read More
  • Alerts & Advisories

    Alerts & Advisories

    Go to http://local.nixle.com/zipcode/43103/ municipal/ or click on the Banner or Read More. Read More
  • Planning & Zoning Project

    Planning & Zoning Project

    The Village of Ashville with Crossroads Community Planning is updating its Planning & Zoning Codes. For more information click on image or "read more". Read More
  • Projects

    Projects

    Access information on projects for parks, streets, & utilities by clicking on the Banner or Read More. Please note that some projects may span years or may involve a combination of Ashville services. Read More
  •  Water Facility Project

    Water Facility Project

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Water Tower Project

    Water Tower Project

    The Village of Ashville is working on replacing the Cromley Water Tower with a North Water Tower. Click on read more or the banner for more information. Read More
  • Water Connection Projects

    Water Connection Projects

    Information about these projects are found by clicking on the Banner or Read More. Earnhart Hill & South Bloomfield(Completed) Water Connection. The webpage was developed to track and provide transparency to this process. Read More
  • Phase II of the State Route 316 Project

    Phase II of the State Route 316 Project

    The Phase II State Route 316 Project is from Station Street to SR 752. Click on Read More of the Banner to access more information. Read More
  • 2024 & 25 Paving Project

    2024 & 25 Paving Project

    Summary information on 2024 Randolph Street Paving Project. For more detailed information you can be linked to the project webpage by clicking on the Banner to the right or Read More Read More
  • Water Resource Recovery Facility Expansion

    Water Resource Recovery Facility Expansion

    Information about this project is found by clicking on the Banner or Read More. The webpage was developed to track and provide transparency to this process. Read More
  • Westside Park Project

    Westside Park Project

    Submitted Westside Park in 2022 and in 2024. Click on image or read more for Information. Read More
  • Park

    Park

    Information on Ashville Park development can be found by clicking on the Banner or Read More. We have been fortunate to benefit from Pickaway County Park District funding. Read More
  • Pedestrian Project

    Pedestrian Project

    Ashville & ODOT is funding a Pedestrian Enhanced Intersection Improvement Project. The intent is to add two (2) pedestrian signals and five (5) LED street lights. For more information click on the Banner or Read. Read More
  • South Metershed Project

    South Metershed Project

    Phase 1 of Improvement Project is funded by the Ohio Public Works Commission & the Ohio Department of Development (American Rescue Plan Act of 2021) for funding. For information click on the Banner or Read More. Read More
  • Resource Connection

    Resource Connection

    Resource information can be found by clicking on the Banner or Read More. This information includes transportation, food, computers, & connectivity, If you have an idea or information, please let us know. Read More
  • Financial Page

    Financial Page

    Financial ReportsThese reports include the Temporary and Permanent Expense Budgets, Anticipated Sources of Revenue Budget, Annual Financial Reports of the village and other financial information. Read More
  • CCR

    CCR

    Water Quality Report is also know as the Consumer Confidence Report (CCR). You can take a look at the report (s) by clicking on the Banner/Read More. Read More
  • Gas Aggregation

    Gas Aggregation

    Gas Aggregation is through Constellation NewEnergy - Gas Division, LLC. This was authorized by Ballot Question, legislation, & contract. For those documents, updates, & past information click on the Banner or Read More. Read More
  •  Ashville Foundation

    Ashville Foundation

    The purpose is to review its history, recruit members, elect officers, and approve by-laws. We encourage you to click on the Banner or Read More to get involved. Read More
  • Reporting Potholes

    Reporting Potholes

    If you see a pothole please call 740-983-6367 and report the location. To find out more about reporting potholes in Ashville, click the Banner or Read More. This will take you to our online reporting system. Read More
  • General Information

    General Information

    By clicking on this Banner or Read More you will find out more information on projects, events, and more. Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

Village of Ashville, Ohio

railroad project logo

Updated September 3, 2015

Finalphase

Last part of project begins with railroad crossing gates have arrival.

Roadway opened at Scioto & West Station, Cromely & West Station, and Randolph & West Station. 

flashing barrier

Crossing remains closed at Griggs and West Station until gates are installed by Norfolk Southern. This process begins August 25,2015                        

 

Photo Gallery by Location.

Darby Creek (KMC) began work at West Station and Griggs on March 10, 2015. Click on the following for a photo gallery of the project:

GrIggs Railroad Crossing Relocation Project Photos     GrIggs Railroad Crossing Relocation Project Photos        GrIggs Railroad Crossing Relocation Project Photos          GrIggs Railroad Crossing Relocation Project Photos
By clicking on the image above you can access photos base on location improvments   By clicking on the image above you can access photos for March-April   By clicking on the image above you can access photos for May-June   By clicking on the image above you can access photos for July-August
Contact Information: Village of Ashville - 740/983-6367 Darby Creek & KMC Paving - 740/477-8600

Timeline below: Click on image will open pdf of "Timeline", OPWD "Request to Proceed", and revised schedule

Timeline

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Public Utilities Commission of Ohio (PUCO) Order to complete Project    

If you wish more information about this project from the partners clicking on the logo to the right will take you to their website.

darby creek

norfolk logo opwc ordc ordc logo puco pomeroy 

Minutes from February 6, 2015 Pre-construction Meeting       Sign-in Sheet from Meeting

Phase One

Item Date Link/PDF File
The letter to the right was mailed to Ashville residents that live in the Griggs and West Station Street area. Click on the image to the right to view the pdf of that letter. December 28, 2012  
The Circleville Herald from time to time will publish an article concerning this project. When that occurs it will be added to the attached artilce that was published Decebmer 2013. Thanks Circleville Herald for keeping our residents informed. December 22 & 23, 2012 circleville herald
Contacts      
Project Schedule    
Pre-Construction Meeting      
Contract      
Resolution    
Legal Notice   circleville herald
Bid Document      
Bid Books Picked-up     
Sign-in Sheet for Bid Opening     
Proposals Submitted      
Bid Tabulation      
Bid Tabulation     
Engineer Estimate      
Plans for Project   picture of plan first page
Accepted Bid with Request     
Notice to Proceed     

Phase Two

Item Date Link/PDF File
The PUCO Commission approval of the Griggs Street Light and Gate upgrade in Ashville, Ohio (DOT#481-432A, Pickaway County). Click on the PUCO Logo to access this document. February 13, 2013 puco
The PUCO Commission approval of Norfolk Southern Railroad Company's Construction Plan and Schedule to replace gate. Click on PUCO Logo to access this document. June 7, 2013 puco
Surface Reconstruction Letter Agreement January 22 & February 22, 2013 ordc
ORDC Letter to Norfolk Souther March 8, 2013 ordc
ORDC Letter to Norfolk Souther Revised March 8, 2013 Letter ordc
Norfolk Southern Railroad Company's
Ashville, Ohio - Station Street - MP N-684.5, DOT# Estimate for proposed surface improvement with NS standard asphalt and rubber surface material. Click on Norfolk Southern Logo to access this document.
May 13, 2013 norfolk logo

The deadlines/requirements are listed below:

  1. By May 14, 2013, NS will submit to ORDC and the Commission's Railroad Division site plans and cost estimates for the project.  Done
  2. By May 21, 2013, NS will file a letter in this docket advising that site plans and cost estimates have been submitted to the Commission. Done
  3. That, following approval of the site plans and cost estimates, NS will proceed with and complete the project on or before February 13, 2014.
  4. That NS notify Staff of any changes in the scope of work, cost overruns, materials, etc., which are not in the approved plans and estimates.
  5. NS will notify the Staff at least five working days before the date work is scheduled to begin at the project site so that arrangements can be made for inspections.
  6. By June 13, 2013, NS will file a notice that they have initiated with South Central Power Company the process to ensure that electric service will be available at the involved grade crossing.

Photo Gallery

darby creek
griggs station logo
logo p
picture of plan first page
pomeroy
presentation schedule time line
railroad project logo
railroad project update logo
station_randolph looking west web
west station_cromley looking east 2 web
west station_cromley looking east web
west station_cromley looking west web
west station_rail looking east web
west station_rail looking west web
west station_railroad looking west web

Maps

pomeroy design plan

map of major locations web

sep logo

S.E.P

In lieu of paying a remaining thirty thousand dollars ($30,000.00) of the civil penalty, the Village of Ashville agreed to complete a supplemental environmental project ("SEP") consisting of spending thirty-five thousand dollars ($35,000.00) to replace and/or install some or all of the following components of its potable water system. The SEP amount may include the cost of equipment and its installation. The SEP shall be considered complete upon Respondent's spending thirty-five thousand dollars ($35,000.00) for appropriate equipment and its installation. Installation of components shall be done in the order listed and in accordance with the following schedule:

  1. Within four (4) months of the effective date of these Orders, replace the four meters within the water treatment plant (WTP) (WTP effluent, WTP raw, and two blend meters) with MAG meters.
  2. Within five (5) months of the effective date of these Orders, provide a standby generator for the WTP.  
  3. Within twelve (12) months of the effective date of these Orders, replace the aerator or provide similar improvement to the oxidation process within the WTP.The first section of this quarter report will deal with the status of the Water Resource Recovery Facility (WRRF). The first heading will discuss the design status. The second heading will deal with the status of obtaining funds for the WRRF.

Resolution 07-2014 Authorization OhioEPA Director's Final "Findings & Orders" (DFFO)

Resolution and "Findings and Orders Document 

Ohio EPA Director's Final Finding and Orders Quarterly Report for SEP
4th Quarter October 2014
1st Quarter January 2015 SEP Requirements Completed

 

Ohio EPA Director's Final Finding and Orders Communication Letters concerning the SEP
Ohio Enviromnental Protection Agency, Central District Office (CDO) Division of Surface Water Compliance and Enforcement Ohio Environmental Protection Agency, Lazarus Governmental Center Division of Surface Water
Letter One Letter One
Letter Two Letter Two
Letter Three Letter Three
Letter Four Letter Four
Letter Five Letter Five
Letter Six Letter Six
Letter Seven Letter Seven
Additional Funds to Complete SEP's that are underway  

 

Logo fields 

This page is established to provide you information on this project.

page updated November 21, 2017

page updated August 7 and July 3, 2017 >> photos on Part A & B progress

 

page updated April 14, 2017 >> Part A Schedule 

page updated February 17, 2017 >> Part B

page updated February 17, 2017 >> Timeline

page updated Novmeber 16, 2016 >> Loan Documents

page updated November 2, 2016 >> Bid Documents

page updated October 7, 2016 >> Pre-bid Agenda

page updated August 25, 2016 >> Construction Schedule

page updated August 4, 2016 >> OWPC Loan Contract and Information

page updated October 10, 2016 >> Construction Photos

page updated April 12, 2016 >> DEFA Loan Documents

By clicking on many of the images below you can access pdfs of the items indicated.

 

 

Timeline August 2017 

 

A pdf version is available by clicking on above image.


The construction of the Water Resource Recovery Facility in Aerial Pictures

The next page contains individual monthly photos

 Aerial Photo from October 25, 2017
DJI 0001
DJI 0013
Aerial from June 22, 2017
Aerial 6 22 2017
Aerial photo from October 13, 2016
airal photo October 13
 Aerial photo from May 5, 2016
DJI 0002 

 

Click on the image below to access the pdf of the PowerPoint presentation of Construction Photos for Part A

The pdf's in this section are based upon PowerPoints presented to Village Council and include photos of the Water Resource Recovery Facility based upon type of process.   Cover Administration    Cover Influent
     Administration Building - Nov.    Influent Pump & Meter - Nov.
Cover Headworks   Cover Splitter Copy   Cover Oxidation Ditch
 Headworks Building - Nov.    Oxidation Splitter Box - Nov.    Oxidation Ditch  - Nov.
Cover Splitter Copy   Cover East Clarifier   Cover West Clarifier
  Clarifier Splitter Box - Nov.    East Clarifier - Nov.    West Clarifier - Nov.
Cover Scum   Cover Digester   Cover Solids Handling
Scum Pump & Valve Vault - Nov.    Aerobic Digester - Nov.   Solids Handling Building - Nov.
Sludge Storage Building   Cover UV   landscaping
Sludge Storage Building - Nov.   Post Air/UV Tank    Landscaping, Fence, & Sidewalk-Nov.
Decomission    Cover Miscellaneous    
 Decommissioning of WWTP - Nov.   Miscellaneous     

The below pdfs are based upon sequence of time not on function.

Photo March   Construction photos april 27   May 2 13 2016
May16 29  

WWRFJune1 15

  June 15 30
July 1 31 2016   August 1 15   Aug 15 31
         
Sep 1 30  

Part A October 2017 

   November 2016
 December 2016    Part A March 2017    

 


Construction Process from Bidding to Construction for Part B

Item Link to Document
A project schedule webpage has been developed. To tract where work is occurring both in calendar and map format click on the image to the right.  schedule
Click here for html Legal Notice on website
 Notice
Pre-Bid Agenda
bid
Pre-Bid Sign-in Sheet Pen
Pre-Bid Minutes minutes
Bid Sign-in Sheet
Pen
Bid Documents
bid
Part B Specification  speci
Plans for Part B Page 1-19 plans
Plans for Part B Page 20-31 plans
Part B Map of Effluent Line and Force Main Part B Map schedule
Plan Holders for Part B Pen
AECOM Bid Comparison Letter
picture2
Seven Bids Submitted

The Engineer’s estimate of cost of construction was $1,686,230.00. The low bid did not exceed 10% of the Engineer’s Estimate. The bids ranged from 11.7% below to 31.8% above the estimate.

The three (3) lowest bids were reviewed for conformance with the bidding requirements of the Contract Documents and comments.

Fields Excavating, Inc. $1,489,605.15

Sam’s Excavating Unlimited, Inc. $1,603,889.04

Darby Creek Excavating, Inc. $1,649,278.42

Tribute Contracting and Consultants LLC $1,788,306.40

Rock River Construction, LTD. *$1,853,729.00

Southern Ohio Trenching & Excavating Inc. $2,153,706.95

Shelly and Sands, Inc. $2,222,502.00

*corrected bid amount

 
Bid Submitted by Fields Excavating, Inc.
 fields
 
Bid Submitted by Sam's Excavating Unlimited, Inc.
 Sams
 
Bid Submitted by Darby Creek Excavating, Inc.
 Darby Creek
Resolution Authorizing Contract
 Resolution

Notice of Commencement of Public Improvement

Section 1311.252 ORC

Proceed
OPWC Request to Proceed Proceed
OPWC Approved Request to Proceed Proceed
OWDA Application for Part B OWDA
Insurance Pen
Notice of Award 
award
Construction Agreement
 Construction
Pre-Construction pdf of PowerPoint
preconstructionpp
Pre-Construction Meeting Sign-in
 Pen
Pre-Construction Agenda
Construction
Pre-Construction Minutes
 minutes
Pre-Construction Drawings
exhibit f engineering
Notice of Commencement of Public Improvement
 
Notice to Proceed
 Proceed
Schedule
 schedule
Contact List
 Contact
Emergency Contact List Contact

Click on the image below to access a pdf of the PowerPoint Presentation for the indicated dates:

Paving
     
B September December   B June August
     
June 2017   May 1 31 2017 B
     
April B 2017   Part B March 2017
     
Part B February         Part B January 16 31

Read more ...

 

 Facebook Logo roundeddownloadphone-png-clipart-phone-icon-clipart-best-clipart-best-image-949-800.png

Govt/Employee Login